• • <br /> 3. On page L-26 of the permit calculations, it appears that the braced frame beam (W24x76) is <br /> subjected to a demand of 409k. Please note that the members that have high axial loads may <br /> exceed the threshold requirements of highly ductile members per AISC 341-16 F2.5a and AISC <br /> 341-16 Table 1-3. Please verify beam demands or revise beam design to meet ductility <br /> requirements. Please note that beam members are also subject to the design requirements of <br /> AISC F2.3. <br /> 4. On page L-26 of the permit calculations,the redundancy factor, p, appears to be applied in <br /> addition to the overstrength factor for loads that are listed as"Exterior Frame Conn Max". Per <br /> ASCE 7-16 Sec 12.10.2.1, connections for drag struts need only require the overstrength factor <br /> in cases 1 and 2. Please clarify the cases where redundancy and overstrength are to be applied. <br /> 5. Please identify the protected zones of the braced frames as this appears to be missing from the <br /> plans. AISC 341 F2.5c. <br /> 6. From the permit calculations it appears that the brace connections are utilizing loading that does <br /> not appear to be the expected tension of the brace. Please clarify and describe if this loading <br /> corresponds to the maximum force that can be delivered to the brace by the system. AISC 341- <br /> 16 F2.6c. <br /> 7. Please indicate dowel bars on detail A/S1.1 are also intended to resolve overturning of panels or <br /> another anchorage system is to be provided. Please provide additional design calculations that <br /> can show that overturning can be resolved into the slab-on-grade. <br /> 8. Please clarify if precast panel connections are intended to be precluded from yielding. If so, <br /> please identify which connections and provide additional calculations per ACI 318-14 18.5.2.2. <br /> RESUBMITTAL REQUIREMENTS <br /> In order for the processing of your application to continue, it will be necessary to provide the Building <br /> Division with the following items: <br /> ❑ (2) New,complete sets of revised construction documents reflecting the corrections as <br /> required. <br /> ❑ (1) Response letter detailing how the corrections were resolved. <br /> All codes cited refer to the 2018 International Building Code (IBC), 2018 International Existing Building <br /> Code (IEBC),the 2018 International Fire Code (IFC),the 2018 International Mechanical Code (IMC), <br /> and/or the 2018 Washington State Energy Code(WSEC), as amended by the State of Washington and <br /> adopted by the City of Everett. The current IBC referenced standard for accessible design is the 2009 <br /> "Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). Federal ADA regulations and <br /> standards may be more restrictive. <br /> ILO Page 2 of <br />