My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/01/31 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/01/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 8:54:43 AM
Creation date
2/1/2024 4:09:42 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/31/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4 <br />surveys and unit costs of building elements for the project. <br /> Parametric costs reflect the level of the 60% design documents, plus appropriate design <br />contingencies to encompass unidentified scope ultimately included in the program. <br /> Assist the City with analyzing scope, schedule, and budget options to stay within the <br />MACC. <br />o 90% Cost Estimate (Pre-Bid Construction Documents level) <br /> Services consisting of development of a probable construction cost from quantity <br />surveys and unit costs of building elements for the project. <br /> Parametric costs reflect the level of the 90% design documents, plus appropriate design <br />contingencies to encompass unidentified scope ultimately included in the program. <br /> Assist the City with analyzing scope, schedule, and budget options to stay within the <br />MACC. <br />1.2 CONDITIONS OF THE AGREEMENT <br />The City has not prepared a detailed scope for the design phase work to be performed under this contract. The <br />City will provide a scope of work outline to the selected consultant. The selected consultant will enter into a <br />Professional Services Agreement, which will establish a maximum contract amount. The City will authorize some <br />or all of the work elements described above on a task basis. <br />The form of contract used for this project is the City of Everett standard Professional Services Agreement which <br />is included in the Appendix. <br />1.3 PROJECT 1 – MAIN LIBRARY <br />A. Main Library Design Objective <br />The City of Everett intends to replace the existing HVAC and DDC systems serving the Main Library to <br />reduce system energy use, increase system reliability, and improve occupant health and comfort. The <br />project scope includes replacement of the (6) existing packaged air conditioners with electric heat with <br />(9) variable air volume high efficiency packaged heat pumps, relocation of (1) of the RTU units, <br />installation of supplemental zone heating, and replacement of the existing DDC system with connected <br />wireless thermostats and controls. Design will include a review of system sizing based on revised <br />building occupancy and use, changes to system ducting, and modifications to (1) system with variable air <br />volume zone control. To be included is the design of necessary electrical and structural modifications, <br />and any noise or architectural screening, if required. <br />B. Project Description <br />• Three (3) of the units will be replaced with minimal modification. <br />• One (1) 7.5-ton unit is to be relocated and connected to existing abandoned ducting. <br />• One (1) 80-ton unit is to be divided into (3) smaller units to increase the number of control zones <br />and allow the use of more readily available and easier to service unitary equipment. <br />• One (1) 7.5-ton unit with multiple electric duct heaters is to be divided into (2) smaller units, <br />allowing the removal of the duct heaters and most of the associated roof top ductwork. Small <br />electric wall heaters will be added in 2 locations and interlocked with the cooling system.
The URL can be used to link to this page
Your browser does not support the video tag.