My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/01/31 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/01/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 8:54:43 AM
Creation date
2/1/2024 4:09:42 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/31/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
7 <br />may be removed from the project based on pricing. <br /> I. Demand control ventilation at zone level. <br /> II. Occupancy sensing at zone level for standby setback <br />• HVAC RTU repairs or refurbishment as needed (beyond controls). Maintenance records will be <br />made available to the Design Consultant/Architect/Mechanical Engineer. <br />• The Design team will coordinate with Snohomish County PUD to maximize conservation grant <br />funding. However, at this time, no energy auditing or energy modeling is required. <br />• Scope will include independent test and balance and commissioning. <br />• The Everett Station will remain open during design and construction. The Design team will <br />participate in developing the construction sequencing and schedule. <br />• The design and construction of this portion is grant funded by Federal Transit Administration. The <br />attached clauses are non-negotiable. <br />C. Project Schedule <br />The proposed project schedule for Everett Station is as follows. Note all three parts of this project will <br />run concurrently: <br />• 30% Design 2 months <br />• Permit Design 1.5 months <br />• 90% Design 1.5 months <br />• Bid 2 months <br />• Build 2 months <br />D. MACC <br />The estimated Maximum Allowable Construction Cost (MACC) is: <br />• $1,498,762 -This includes all materials, equipment, and labor. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.