My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 27 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 72 00 - 27 GENERAL CONDITIONS <br />4. Total number of hours employed each day. <br />5. Total number of hours employed during the payroll period. <br />6. Straight time and overtime hourly rate of wages paid to each worker. <br />7. Total or gross amount earned by each worker. <br />8. Deductions for Medical Aid, FICA, Federal withholding tax, and any other deductions <br />taken. <br />9. Net amount paid each worker. <br />10. Contractor's, or Subcontractor's, name and address. <br />11. Days and dates worked. <br />12. Date of final day of pay period. <br />13. Whether fringe benefits were paid to each worker as part of the hourly wage rate or <br />whether fringe benefits were paid into an approved plan, fund, or program. <br />Payrolls may be submitted on Federal payroll form WH-347, or equivalent. The reverse side of the form <br />contains an affidavit that shall be filled out and signed. If the Contractor's payroll reports are <br />computerized, the computerized reports may be submitted along with a Statement of Compliance affidavit <br />photo copied from the back of form WH-347, or equivalent. <br />The first payroll submitted for the Work for both the Contractor and each Subcontractor shall be labeled <br />"Initial.” The last payroll submitted for the Work for both the Contractor and each Subcontractor shall be <br />labeled "Final.” Payrolls shall be sequentially numbered for all periods in which Work has been done. A <br />certificate of completion for the Work, signed by the City, will constitute acceptance of the Work. The <br />issuance of this certificate of completion will not constitute acceptance of unauthorized or defective Work <br />or material is performed. <br />7.3. HOURS OF LABOR <br />Contractor shall comply with all applicable laws and regulations regarding hours of work, including, but <br />not limited to, RCW Chap. 49.28. <br />7.4. CONTRACT WORK HOURS <br />The Contractor shall comply with Section 103 of the Contract Work Hours and Safety Standards Act (40 <br />U.S.C. section 327-330) as supplemented by Department of Labor Regulations (29 CFR, Part 5). Under <br />this section the Contractor shall compute the wages of every mechanic and laborer on the basis of a <br />standard work week of forty (40) hours. Work in excess of the standard work week is permissible, <br />provided the worker is compensated as required by law. <br />7.5. OVERTIME WORK <br />Overtime and shift work may be established as a regular procedure by the Contractor with reasonable <br />Notice to and written permission of the Owner’s Representative. Permission may be denied for such <br />reasons as noise, traffic, or other interference with the neighborhood in which the Project is located, or the <br />lack of availability of inspectors during overtime or shift work.
The URL can be used to link to this page
Your browser does not support the video tag.