Laserfiche WebLink
City of Everett 00 72 00 - 28 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 72 00 - 28 GENERAL CONDITIONS <br />7.6 LABOR RELATIONS <br />The Contractor shall take all reasonable steps to prevent any labor Disputes involving the Contractor and <br />any of its Subcontractors or Suppliers of any products or services from disrupting the Work under this <br />Contract or interfering with access to the Owner's property by the Owner, including its agents, <br />representatives, employees and officials, any other contractors engaged in construction activities, or <br />members of the public. In the event any picketing or other concerted activity by employees involved in a <br />labor Dispute with the Contractor or its Subcontractors or Suppliers interferes in any way with access to <br />the Owner's property by any persons, the Contractor shall promptly and expeditiously take all reasonable <br />actions to eliminate or minimize such interference, including but not limited to: (1) utilizing all <br />reasonable means of restricting any picketing to a single entrance to the Owner's property; (2) posting <br />notices or signs which advise interested persons and labor organizations that a particular entrance to the <br />Owner's property is for the employees of "primary" or, as the case may be, "neutral" employers; (3) <br />policing entrances to ensure that only authorized personnel may use those entrances; (4) notifying all <br />interested labor organizations of the "primary" or "neutral" status of particular entrances; and (5) in the <br />event any such picketing or concerted activity is unlawful or has a secondary impact upon the employees <br />of neutral employers, promptly and expeditiously taking appropriate action to seek recourse through the <br />appropriate governmental agency or state or federal courts to limit the location of such picketing so as to <br />reduce the impact thereof upon neutral employers. <br />The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render <br />assistance as may be in the best interests of the Owner. However, the Owner shall have the right to direct <br />the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to <br />overrule such actions, to designate the entrances to be used as "primary" or "neutral" entrances, and to <br />take appropriate legal action in order to protect the Owner's property and interests. In any event, the <br />Contractor shall be liable for all Delays and costs, including costs to the Owner, and actual damages <br />resulting from the relocation, rerouting, Delays or actions required to maintain the uninterrupted progress <br />of the Work. Failure by the Contractor to take the actions described above or to comply with the <br />directives of the Owner shall be considered a breach of this Contract and the Owner may terminate the <br />Contract or suspend the Contractor as provided in this Contract. <br />8. MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES <br />8.1. GENERAL <br />Unless otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for <br />materials, labor, tools, Equipment, water, light, power, transportation, supervision, and temporary <br />construction of any nature, and other services and facilities of any nature, whatsoever necessary, to <br />execute, complete and deliver the Work within the specified time. Contractor shall be liable for all power <br />and water costs until Substantial Completion, whether such power or water is provided by temporary or <br />permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the <br />availability or lack of availability of permanent power or utilities. Material and Equipment shall be new <br />and of the specified quality. Equipment offered shall be new or current specified models. This <br />requirement does not apply to minor details, or to thoroughly demonstrated improvements in design or in <br />materials of construction. Construction Work shall be executed in conformity with the standard practice <br />of the trade.