My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 21 13 - 2 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 21 13 - 2 INSTRUCTIONS TO BIDDERS <br />3. State Requirements. If applicable: <br />a. Have Industrial Insurance (workers’ compensation) coverage for the bidder’s <br />employees working in Washington, as required in Title 51 RCW; <br />b. Have a Washington Employment Security Department number, as required in <br />Title 50 RCW; and <br />c. Have a Washington Department of Revenue state excise tax registration <br />number, as required in Title 82 RCW. <br />4. Disqualification. Not be disqualified from bidding on any public works contract <br />under RCW 39.06.010 or 39.12.065(3). <br />5. Prevailing Wage Training. Unless Bidder has completed three or more public <br />works projects and had a valid business license for three or more years, Bidder <br />must have received Department of Labor and Industries training on the <br />requirements related to public works and prevailing wage under RCW 39.12 and <br />RCW 39.04. <br />5. Certification of Wage Compliance. Within the three-year period immediately <br />preceding the date of the bid solicitation, not have been determined by a final and <br />binding citation and notice of assessment issued by the department of labor and <br />industries or through a civil judgment entered by a court of limited or general <br />jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of <br />chapter 49.46, 49.48, or 49.52 RCW. <br />6. Apprentices. If the Project is subject to the apprenticeship utilization requirements <br />in RCW 39.04.320, not have been found out of compliance by the Washington state <br />apprenticeship and training council for working apprentices out of ratio, without <br />appropriate supervision, or outside their approved work processes as outlined in <br />their standards of apprenticeship under chapter 49.04 RCW for the one-year period <br />immediately preceding the date of the bid solicitation. <br />1-02.1(2) Supplemental Bidder Responsibility Criteria <br />If this Project is subject to supplemental bidder responsibility criteria, then such criteria <br />will be contained in SECTION 00 22 13, SUPPLEMENTAL INSTRUCTIONS TO <br />BIDDERS. If there is no SECTION 00 22 13, SUPPLEMENTAL INSTRUCTIONS TO <br />BIDDERS in the bid package, then the Project is not subject to supplemental bidder <br />responsibility criteria. <br />1-02.2 Plans and Specifications <br />Information as to where bid documents can be obtained or reviewed will be found in the <br />Call for Bids (Advertisement for Bids) for the Work. <br />1-02.3 Not Used <br />1-02.4 Examination of Plans, Specifications, and Site of Work <br />1-02.4(1) General <br />The Bidder shall carefully examine the Contract Documents. Submittal of a Bid shall be <br />conclusive evidence that the Bidder has made these examinations and understands all <br />requirements for the performance of the completed Work. The Bidder further warrants, <br />agrees, and acknowledges by submitting a Bid that it: <br />1. Has taken steps reasonably necessary to ascertain the nature and location <br />of the Work, including without limitation the actual physical conditions of and <br />at the location, surface and subsurface conditions, and conditions ordinarily <br />to be encountered and generally recognized as inherent in the Work;
The URL can be used to link to this page
Your browser does not support the video tag.