Laserfiche WebLink
City of Everett 00 72 00 - 41 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 72 00 - 41 GENERAL CONDITIONS <br />9.6.2. Materials. <br />The Owner will reimburse actual invoice cost for Contractor-supplied materials. This cost includes actual <br />freight and express charges and taxes, provided that these costs have not been paid in some other manner <br />under the Contract. A deduction will be made for any offered or available discounts or rebates if the <br />Owner has provided the Contractor with the means to comply with the provisions allowing the discount. <br />The Owner will then add twenty-one (21) percent of the balance to cover Project overhead, general <br />company Overhead, profit, and any other cost of supplying materials. <br />To support charges for materials, the Contractor shall provide the Owner’s Representative with authentic, <br />complete and accurate copies of vendor invoices, including freight and express bills. If invoices are not <br />available for materials from the Contractor stocks, the Contractor shall certify actual costs by affidavit. <br />If Contract Claims for materials costs are too high, inappropriate, or unsupported by satisfactory <br />evidence, the Owner’s Representative may determine the cost for all or part of the materials. When <br />determined in this manner, the cost will be the lowest current wholesale price from a source that can <br />supply the required quantity, including delivery costs. <br />The Owner reserves the right to provide materials. If so, the Contractor will receive no payment for any <br />costs, Overhead, or profit on such materials. <br />9.6.3. Equipment. <br />The equipment rates shall be actual cost but shall not exceed the rates set forth in the AGC/WSDOT <br />Equipment Rental Agreement in effect at the time the Work is performed, <br />The approval of the Owner’s Representative shall be required for the selection of machine-power tools or <br />equipment prior to their use in Force Account situations. <br />The payment for any machine-power tools or equipment shall be made according to the current <br />AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is authorized. The <br />rates as set forth in the Rental Rate Blue Book (as modified by the current AGC/WSDOT Equipment <br />Rental Agreement) are the maximum rates allowable for equipment of modern design and in good <br />working condition. These rates shall be full compensation for all fuel, oil, lubrication, repairs, <br />maintenance, and all other costs incidental to furnishing and operating the equipment except labor for <br />operation. <br />The Owner will add twenty-one (21) percent to equipment costs to cover Project Overhead, general <br />company Overhead (excluding equipment Overhead included in the Rental Rate Blue Book), and profit. <br />Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental Agreement will be <br />maintained at each region office of the Washington State Department of Transportation and at each of the <br />offices of the Associated General Contractors of America, in Seattle, Spokane, Tacoma, Washington and <br />Wilsonville, Oregon, where they are available for inspection. <br />9.6.4. For Services. <br />Compensation under Force Account for specialized services shall be made on the basis of an invoice from <br />the providing entity. A “specialized service” shall be one that is typically billed through invoice in <br />standard industry practice. Before Work is started, the Owner’s Representative may require the <br />Contractor to obtain multiple quotations for the service to be utilized and select the provider with prices <br />and terms most advantageous to the Owner. In the event that prior quotations are not obtained and the <br />service invoice is submitted by the Subcontractor, then after-the-fact quotations may be obtained by the <br />Owner’s Representative from the open market in the vicinity and the lowest such quotation may be used <br />in place of the submitted invoice. <br />Except as noted below, the Owner will pay the Contractor an additional twenty-one (21) percent of the <br />sum of the costs included on invoices for specialized services to cover project Overhead, general <br />company Overhead, profit, bonding, insurance, Business & Occupation tax, and other costs incurred.