My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 21 13 - 4 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 21 13 - 4 INSTRUCTIONS TO BIDDERS <br />The Contractor shall bear all cost for such insurance as provided in the Contract <br />Documents. <br />No Claim shall be allowed because of any ambiguity in the Contract if: <br />1. The Bidder discovers an ambiguity but fails to notify the City, or <br />2. The Bidder failed to discover a patent ambiguity that would be discovered <br />by a reasonably prudent contractor in preparing its Bid. <br />Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, <br />shall request the explanation or interpretation in writing by close of business seven <br />business days preceding the Bid opening to allow a written reply to reach all prospective <br />Bidders before the submission of their Bids. <br />Bidder acknowledges that the Bidder has not relied on representation or warranty of the <br />City not expressly included in the Contract Documents. <br />The information provided by the City is not intended to be a substitute for, or a <br />supplement to, the independent verification by the Bidder to the extent such independent <br />investigation of the Drawings and Specifications or Site conditions is deemed necessary <br />or desirable by the Bidder. Bidder acknowledges that they have not relied upon City or <br />Engineer furnished information regarding site conditions in preparing and submitting a <br />Bid. <br />1-02.4(1)A Interpretation of Contract Documents <br />Should a Bidder find what is believed to be discrepancies in or omissions from the <br />Plans, Specifications, or any other Contract Document, or should the Bidder be in <br />doubt as to their meaning, Bidder may submit to the City a written request for an <br />interpretation thereof. The Bidder submitting the request will be responsible for its <br />prompt delivery. Any interpretation of the documents, if made, will be made only by <br />addendum duly issued. All requests for interpretations must be received by <br />the City or Engineer no later than 7 calendar days prior to the bid opening <br />date. All questions regarding the Contract Documents shall be referred to the City <br />at the address provided in the Contract Documents. <br />1-02.4(1)B Prevailing Wages <br />Bidder is directed to the Contract Documents for requirements regarding applying <br />payment of prevailing wage rates for employment of labor on within Snohomish <br />County. <br />All laborers, workmen, or mechanics in each trade or occupation employed in the <br />performance of the Contract either by Contractor, Subcontractor, or other person <br />doing Work shall be paid not less than the prevailing rate of wage as defined in <br />RCW 39.12.010. Current prevailing wage rates may be found online at <br />http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/. The rules and <br />regulations noted within the Contract Documents are available from: <br />State of Washington Department of Labor and Industries <br />Prevailing Wage Section <br />PO Box 44540 <br />Olympia, WA 98504-4540 <br />(360) 902-5335 <br />pw1@lni.wa.gov
The URL can be used to link to this page
Your browser does not support the video tag.