My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 21 13 - 5 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 21 13 - 5 INSTRUCTIONS TO BIDDERS <br />Bidders are advised to examine and to be thoroughly familiar with such <br />requirements. No claim for additional compensation will be allowed that is based <br />upon a lack of knowledge of these requirements or a failure to include adequate <br />increases in such wages over the term of this Contract in the Bidder's Bid. <br />1-02.4(2) Subsurface Information <br />If the City has made subsurface investigation of the site of the proposed Work, the <br />boring log data and soil sample test data accumulated by the City will be made <br />available for inspection by the Bidders. The boring logs and soil sample test data <br />shall NOT be considered as part of the Contract. In addition, the City makes no <br />representation or warranty expressed or implied that: <br />1. The Bidders’ interpretations from the boring logs are correct, <br />2. Moisture conditions and indicated water tables will not vary from those <br />found at the time the borings were made, and <br />3. The ground at the location of the borings has not been physically <br />disturbed or altered after the boring was made. <br />The City specifically makes no representations, guarantees, or warranties as to <br />the condition, materials, or proportions of the materials between the specific <br />borings regardless of any subsurface information the City may make available to <br />the prospective Bidders. <br />The boring log data and soil sample data, if any, are included in the bid documents. <br />If there is a geotechnical report made by the City, Bidder may contact the Project <br />Manager to arrange to view the geotechnical report. <br />1-02.5 Bid Form <br />The City reserves the right to arrange the bid forms with alternates and additives, if such <br />be to the advantage of the City. The Bidder shall bid on all alternates and additives set <br />forth in the Bid Form unless otherwise specified. <br />1-02.6 Preparation of Bid <br />Bids shall be submitted on the forms provided by the City and found in the Contract <br />Documents. All blank spaces in the Bid form shall be legibly filled in using a non-erasable <br />medium. Do not qualify Bids, since this will automatically be cause for rejection of the Bid. <br />A Bid will be rejected if the authorized Bid form furnished by the City is not used. <br />Bid prices shall include everything necessary for the completion of the Work including, but <br />not limited to, providing the materials, equipment, tools, plant and other facilities, and the <br />management, superintendence, labor, and all necessary testing services. <br />Bidders are warned against making erasures or alterations of any kind to the Bid Form, <br />and bids that contain omissions, erasures, or irregularities of any kind may be rejected. <br />No oral, telegraphic, electronic, or telephonic bids or modifications will be considered. <br />In the event that the product of a unit price and an estimated quantity does not equal the <br />extended amount quoted, the unit price shall govern, and the correct product of the unit <br />price and the estimated quantity shall be deemed to be the amount bid. If the sum of two <br />or more items in a bidding schedule does not equal the total amounts quoted, the individual <br />item amounts shall govern, and the correct total shall be deemed to be the amount bid.
The URL can be used to link to this page
Your browser does not support the video tag.