My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 73 00 - 1 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 73 00 - 1 SPECIAL CONDITIONS <br />SECTION 00 73 00 - SPECIAL CONDITIONS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. The following “Special Conditions” shall supplement the General Conditions and shall <br />become a part of this contract: <br />PART 2 - STORAGE, STAGING AND DUMPSTER AREAS <br />2.1 Location: Contractor will be responsible for storage of materials and equipment prior to <br />commencing installation phase. Staging of material and equipment during construction <br />phase will be located in designated areas and not interfere with storage facility <br />operations. Available space within the immediate area where work is to be performed <br />will be available for the contractor to stage material. <br />2.2 The contractor shall be responsible for the provisions for a dumpster(s). Location of a <br />dumpster shall be located within the staging area described above. Should a dumpster <br />not be possible due to site access limitations the contractor shall be responsible for an <br />alternate means of waste disposal. <br />PART 3 - SITE ACCESS & SECURITY <br />3.1 Access: <br />A. Entry & Exit: The Contractor will be given access into facility by City’s representative or <br />be issued a key as necessary. <br />B. The Contractor shall maintain conditions of access roads to Project Site(s) such that <br />access is not hindered as the result of construction related deterioration. <br />C. The Contractor shall maintain access for emergency personnel, facility personnel, and <br />authorized third parties at all times, unless discussed and otherwise approved by <br />Owner. <br />D. The Contractor shall maintain access routes for emergency vehicles at all times.
The URL can be used to link to this page
Your browser does not support the video tag.