My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 73 00 - 2 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 73 00 - 2 SPECIAL CONDITIONS <br />PART 4 - WORKING HOURS <br />4.1 Contractor will be required to provide a project schedule that clearly defines each phase <br />of work including planned facility closure(s), length of time area(s) is/are to be closed, <br />and projected reopening of affected area(s). <br />4.2 Work Hours: The Contractor shall provide work schedule. <br />A. Work hours are limited to the following hours: <br />1. 7:00 AM to 5:00 PM on weekdays. <br />2. As approved by Owner’s Representative on weekends and state recognized <br />holidays. <br />4.3 Be aware that all construction sites will be monitored and violators are subject to fines. <br />4.4 Other hours may be considered on a limited basis without interruption of Owner’s <br />normal operations. All requests for working hours other than those stated above shall <br />be made exclusively through the Owner’s Representative. <br />PART 5 - OWNER OCCUPATION AND OPERATIONS <br />5.1 Owner intends for uninterrupted storage facility access during all construction work. <br />A. The Contractor shall coordinate with Owner in scheduling construction activities to <br />minimize conflict with storage facility access. <br />B. The Contractor shall be aware of adjacent Naval Station and limitations on work <br />activities along the property perimeter. Refer to drawings for additional information. <br />END OF SECTION 00 73 00
The URL can be used to link to this page
Your browser does not support the video tag.