Laserfiche WebLink
City of Everett 00 73 00 - 2 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 73 00 - 2 SPECIAL CONDITIONS <br />PART 4 - WORKING HOURS <br />4.1 Contractor will be required to provide a project schedule that clearly defines each phase <br />of work including planned facility closure(s), length of time area(s) is/are to be closed, <br />and projected reopening of affected area(s). <br />4.2 Work Hours: The Contractor shall provide work schedule. <br />A. Work hours are limited to the following hours: <br />1. 7:00 AM to 5:00 PM on weekdays. <br />2. As approved by Owner’s Representative on weekends and state recognized <br />holidays. <br />4.3 Be aware that all construction sites will be monitored and violators are subject to fines. <br />4.4 Other hours may be considered on a limited basis without interruption of Owner’s <br />normal operations. All requests for working hours other than those stated above shall <br />be made exclusively through the Owner’s Representative. <br />PART 5 - OWNER OCCUPATION AND OPERATIONS <br />5.1 Owner intends for uninterrupted storage facility access during all construction work. <br />A. The Contractor shall coordinate with Owner in scheduling construction activities to <br />minimize conflict with storage facility access. <br />B. The Contractor shall be aware of adjacent Naval Station and limitations on work <br />activities along the property perimeter. Refer to drawings for additional information. <br />END OF SECTION 00 73 00