My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 11 00 - 1 <br />Port Gardner Storage Facility – Demolition Package WO# UP-3525 <br />01 11 00 - 1 SUMMARY OF WORK <br />SECTION 01 11 00 - SUMMARY OF WORK <br />1.1 SCOPE OF WORK <br />A. The Work specified for this contract consists of partial redevelopment of the <br />former Kimberly Clark Wastewater Treatment Plant into the Port Gardner <br />Storage Facility (PGSF). The PGSF will improve Puget Sound water quality by <br />reducing combined sewer overflows (CSO) and providing regional stormwater <br />treatment. The work as part of this contract generally includes, but shall not be <br />limited to the following: <br />1. Selective demolition in multiple areas. <br />2. Pipeline inspection and cleaning. <br />3. Concrete slab/topping layer repair and/or replacement in existing <br />secondary clarifiers. <br />4. Temporary roof infill at old chemical storage building. <br />5. Temporary site power and lighting installation. <br />6. Temporary fencing installation. <br />7. Erosion and Sediment Control <br />8. Hazardous waste materials abatement <br />1.2 CONTRACTOR’S USE OF SITE AND PREMISES <br />A. The Contractor shall assume full responsibility for protection and safekeeping of <br />products under this Contract. <br />B. The Contractor shall obtain and pay for use of any additional parking, storage or <br />work areas needed for his/her operations. <br />C. The Contractor shall limit the construction activities to the areas indicated on the <br />Drawings. <br />D. Construction Plan: Before the start of construction, provide a Construction Plan <br />regarding access to Work, use of Site, proposed laydown areas and utility <br />outages for acceptance by the City. After acceptance of the Plan, construction <br />operations shall comply with the accepted Plan unless deviations are accepted <br />by the City in writing.
The URL can be used to link to this page
Your browser does not support the video tag.