My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 11 00 - 4 <br />Port Gardner Storage Facility – Demolition Package WO# UP-3525 <br />01 11 00 - 4 SUMMARY OF WORK <br />D. All construction shall be in conformance with the City of Everett Design and <br />Construction Standards and Specifications, latest edition, only to the extent that <br />they are called out in the Contract Documents. <br />E. All work shall comply with applicable requirements of Snohomish County. <br />F. Any material specified by reference to the number, symbol, or title of a specified <br />standards, such as Commercial Standard Federal Specifications, a trade <br />association standard, or other similar standard, shall comply with the <br />requirements of the latest revision thereof, and any amendment or supplement <br />thereto in effect on the date of Invitation for Bids, except as limited to type, class <br />or grade, or modified in such references. All work shall conform to the standard <br />referred to, except as modified in these specifications and the drawings. <br />1.9 CHECKING PLANS AND SPECIFICATIONS <br />A. PRIOR SUBMISSION OF BIDS: The Contractor shall report any discovered <br />patent discrepancies or omissions in the plans and/or specifications to the <br />Engineer for a decision prior to the Submission of Bids. <br />B. RESOLUTION OF CONFLICTS: Where there is conflict between the plans and <br />the specifications in regard to materials, equipment, sizes, numbers or locations, <br />the Owner shall be the sole judge in resolving the conflict. <br />1.10 REFERENCE DOCUMENTS <br />A. The Contract Documents refer to reference documents where needed to <br />describe the Work, define elements of the Work, describe standards of the <br />Work, provide procedures and policies for the Work, and provide constraints <br />under which the Work is to take place. <br />B. The following attachments are included in Volume 3 of the Contract Documents <br />as reference documents: <br />1. Attachment A: Scott Paper Company and Kimberly-Clark As-Built Drawings <br />for Port Gardner Storage Facility Site <br />2. Attachment B: July 2023 Geotechnical Report Port Gardner Wet Weather <br />Design <br />3. Attachment C: HWA GeoSciences Inc. Concrete Coring & Lab Testing for <br />Structural Evaluation <br />4. Attachment D: Corrosion Probe, Inc. October/November 2022 Condition <br />Assessment
The URL can be used to link to this page
Your browser does not support the video tag.