City of Everett 01 11 10 - 1 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />01 11 10 - 1 GEOTECHNICAL INFORMATION <br />SECTION 01 11 10 - GEOTECHNICAL INFORMATION <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A. This Section specifies geotechnical information for the Contract. <br />1.2 DESCRIPTION <br />A. The following geotechnical report is provided as a reference document to the <br />Contract Documents and a copy of the report is included in Attachment B in <br />Volume 3: <br />1. “Preliminary Geotechnical Engineering Report, 30 Percent Milestone, Port <br />Gardner Storage Facility, Everett, Washington, HWA, Project No. 2021-159-21, <br />dated July 14, 2023. <br />B. The geotechnical information is not intended to be the Owner’s representations of <br />geotechnical conditions, except for those conditions at the specific times and <br />locations of the investigations. <br />1.3 GEOTECHNICAL INFORMATION USE <br />A. The Contractor shall make its own interpretations, evaluations and conclusions as to <br />the nature of the geotechnical materials and conditions to determine the difficulties <br />performing the Work affected by the geotechnical conditions. <br />B. In making interpretations, evaluations, and conclusions, use the geotechnical <br />documents and the available geotechnical information in a manner that includes a <br />reasonable interpretation after consulting with a registered professional civil engineer <br />with geotechnical expertise or a certified engineering geologist or a certified <br />engineering hydrogeologist with applicable expertise. <br />C. The Contractor may also, at no additional cost to the Owner, conduct other <br />investigations and tests it deems appropriate. Any additional Contractor obtained <br />investigation and test information shall be shared with the Owner. <br />D. The Owner does not warrant and specifically disclaims responsibility for the <br />interpretation by the Contractor of such geotechnical information. The Contractor <br />shall make its own interpretations, deductions, and conclusions as to the nature of <br />the materials to be excavated, the difficulties of making and maintaining the required <br />excavations, and the difficulties of doing other work affected by geotechnical <br />conditions, including dewatering and installing temporary shoring, and accept full <br />responsibility, thereof. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION 01 11 10