My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 25 00 - 2 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />01 25 00 - 2 SUBSTITUTION PROCEDURES <br />C. NAME PLATES: Except for required labels and operating data, do not attach or imprint <br />manufacturer's or producer's nameplates or trademark on surfaces of products which <br />will be exposed to view in occupied spaces or on the exterior. <br />1. LABELS: Locate required product labels and stamps on a concealed surface or, <br />where required for observation after installation, on an accessible surface that is <br />not conspicuous. <br />1.4 SUBMITTALS <br />A. PRODUCT LISTING SUBMITTAL: Submit three (3) copies of the product-listing <br />schedule within thirty (30) days after the date of commencement of the work. Provide a <br />written explanation for omissions of data, and for known variations from contract <br />requirements. At Contractor's option, initial submittal of the product-listing schedule <br />may be limited to product selections and product designations that must be established <br />early in the contract time. Submit completed product-listing schedule within sixty (60) <br />days after commencement of the work. <br />1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. Deliver, store, and handle products in accordance with the manufacturer's <br />recommendations, using means and method that will prevent damage, deterioration <br />and loss, including theft. <br />B. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding <br />of construction spaces. <br />C. Coordinate delivery with installation time to ensure minimum holding time for items that <br />are flammable, hazardous, easily damaged, or sensitive to deterioration, theft and other <br />losses. <br />D. Deliver products to the site in the manufacturer's original sealed container or other <br />packaging system, complete with labels and instruction for handling, storing, unpacking, <br />protecting and installing. <br />E. Inspect products upon delivery to ensure compliance with the contract documents, and <br />to ensure that products are undamaged and properly protected. <br />F. Store products at the site in a manner that will facilitate inspection and measurement of <br />quantity or counting of units. <br />G. Store heavy materials away from the project structure in a manner that will not <br />endanger the supporting construction. <br />H. Store products subject to damage by the elements above ground, under cover in a <br />weather-tight enclosure, with ventilation adequate to prevent condensation. Maintain <br />temperature and humidity within range required by manufacturer's instructions. <br />I. OFF-SITE STORAGE: If requested by the Contractor and approved in writing by the <br />Owner, the Owner may make payment to the Contractor for products stored off-site.
The URL can be used to link to this page
Your browser does not support the video tag.