My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 25 00 - 1 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />01 25 00 - 1 SUBSTITUTION PROCEDURES <br />SECTION 01 25 00 - SUBSTITUTION PROCEDURES <br />PART 1 - GENERAL <br />1.1 GENERAL <br />A. This Section specifies administrative and procedural requirements governing the <br />Contractor's selection of products for use in the project, and administrative procedures <br />for handling requests for substitutions made after award of contract. <br />1.2 DEFINITIONS <br />A. Definitions used in this paragraph are not intended to negate the meaning of other <br />terms used in the contract documents. <br />1. "Products" are items purchased for incorporation in the work, regardless of <br />whether they were specifically purchased for the project or taken from the <br />Contractor's previously purchased stock. <br />2. "Named Products" are products identified by use of the manufacturer's name for a <br />product, including such items as a make or model designation, as recorded in <br />published product literature, of the latest issue as of the date of the contract <br />documents. <br />3. "Materials" are products that must be substantially cut, shaped worked, mixed, <br />finished, refined or to otherwise fabricated, processed, or installed to form units of <br />work. <br />4. "Equipment" is defined as a product with operational parts, regardless of whether <br />motorized or manually operated, and in particular, a product that requires service <br />connections such as wiring or piping. <br />5. The terms "equal", "or equal", "or approved equal" and "or approved" are <br />synonymous. All proposed "equal" products, materials, and equipment must be <br />approved by the substitution request process. <br />1.3 QUALITY ASSURANCE <br />A. SOURCE LIMITATIONS: Provide product of same kind, to fullest extent possible, from <br />a single source. <br />B. COMPATIBILITY OF OPTIONS: When Contractor is given the option of selecting <br />between two or more products for use on the Project, the product selected shall be <br />compatible with products previously selected, even if previously selected products were <br />also options.
The URL can be used to link to this page
Your browser does not support the video tag.