My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 21 13 - 12 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 21 13 - 12 INSTRUCTIONS TO BIDDERS <br />Sales Tax <br />The Washington State Department of Revenue has issued special rules on the State sales <br />tax. The Contractor should contact the Washington State Department of Revenue for <br />answers to questions in this area. The City will not adjust its payment if the Contractor bases <br />a Bid on a misunderstood tax liability. The Contractor shall not include State retail sales taxes <br />in the unit bid prices. A separate line item for applying State retail sales tax is provided in <br />the Bid Form. <br />Limitations Regarding Contractor’s Claim for Damages <br />Bidders should review the Contract Documents regarding limitations on claims for <br />damages. <br />Delays and Interference <br />Bidders should review the Contract Documents regarding delays and interference. <br />Business License <br />A City of Everett business license is required for the Contractor and Subcontractors <br />performing Work on this Project. <br />BIDDER’S CHECKLIST <br />Forms for Submission with the Bid <br />The Bidder’s attention is especially called to the following forms that must be executed in <br />full as required and submitted with the Bid. <br />1. Bid Form: Show the lump sum and unit price items in the spaces provided on the <br />Bid Form. To be filled in and signed by the Bidder <br />2. Subcontractors Form: To be filled in by the Bidder, if required by these <br />Instructions. <br />3. Bid Security: This form is to be executed by the Bidder and the surety company <br />unless Bid is accompanied by a certified or cashier’s check, as required by these <br />instructions. The amount of the bond or cashier’s check, which shall be not less <br />than five percent of the Total Bid Amount, may be shown in dollars or on a <br />percentage basis. <br />4. Disadvantaged/Minority/Women’s Business Enterprise Certification: To be filled <br />in and signed by the Bidder. <br />5. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br />Failure to complete and fully execute the aforementioned forms and to submit them with <br />the Bid may result in rejection of Bid. <br />Forms for Submission after Award of Contract <br />The following forms are to be executed after the award of Contract: <br />1. Contract: This Contract to be executed by the successful Bidder with the City’s <br />AdobeSign system within 14 calendar days after the award date. <br />2. Payment and Performance Bonds: These forms are to be executed by the <br />successful Bidder and the Bidder’s surety company. The amount of these bonds <br />shall be 100 percent of the Total Bid and shall be submitted with the Contract. <br />3. Proof of Insurance: Insurance certificates and endorsements shall be obtained <br />and maintained in force in accordance with SECTION 00 72 00, Part 15 “Liability <br />and Insurance”, of the Contract Documents. <br />4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must <br />file with each bond a certified and effectively dated copy of their Power of Attorney.
The URL can be used to link to this page
Your browser does not support the video tag.