Laserfiche WebLink
City of Everett 00 21 13 - 11 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 21 13 - 11 INSTRUCTIONS TO BIDDERS <br />1-03.4 Contract Bonds <br />The Contractor shall provide a separate payment bond and performance bond, each in <br />the amount of 100 percent of the Contract Sum and each in the form contained in the <br />Contract Documents. The bonds must be accompanied by a fully executed and original <br />power of attorney for the officer executing on behalf of the surety. <br />1-03.5 Failure to Execute Contract <br />Failure to return the proof of insurance and the bonds with the signed Contract as required <br />in these Instructions, or failure or refusal to sign the Contract, or failure to register as a <br />contractor in the state of Washington shall result in forfeiture of the bid bond or deposit of <br />this Bidder. If this should occur, the City may then Award the Contract to the second <br />lowest responsible Bidder or reject all remaining Bids. If the second lowest responsible <br />Bidder fails to return the required documents as stated above within the time provided <br />after Award, the Contract may then be Awarded successively in a like manner to the <br />remaining lowest responsible Bidders until the above requirements are met or the <br />remaining Bid are rejected. <br />In addition, failure to have or obtain a City of Everett business license prior to executing <br />the Contract, unless immediately cured by Bidder after notice from the City, shall result in <br />forfeiture of the proposal bond or deposit of this Bidder. <br />1-03.6 Return of Bid Deposit <br />When Bids have been examined and corrected as necessary, proposal bonds and <br />deposits accompanying Bids ineligible for further consideration will be returned. All other <br />proposal bonds and deposits will be held until the Contract has been properly executed. <br />When the Contract has been properly executed, all remaining deposits or bonds, except <br />those subject to forfeiture, will be returned. <br />Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br />accompanying the Bids that are not to be considered in making the Award. <br />1-03.7 Judicial Review <br />All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal <br />Code, “Bid Protest Procedures.” <br />The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br />OTHER MATTERS <br />Time of Completion <br />The Contractor shall complete the Work on or before the date or dates specified in Section <br />00 52 13 - AGREEMENT FORM <br />Equal Employment Opportunity <br />The Contractor will be required to assure that equal employment opportunities will be in effect <br />to all individuals throughout the duration of this Contract, pursuant to SECTION 00 72 00, <br />Part 7 “Labor Standards,” of the Contract Documents. The Contractor must comply with all <br />local, State and Federal laws pertaining to non-discrimination and equal employment <br />opportunity.