My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 41 13 - 2 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 41 13 - 2 BID FORM <br />ITEM <br />NO.DESCRIPTION UNIT <br />ESTIMATED <br />QUANTITY <br />UNIT <br />PRICE <br />CONTRACT <br />PRICE <br />4.Pipeline Cleaning and <br />Inspections <br />Lump <br />Sum <br />1 N/A $_______.___ <br />5.Temporary Site Power <br />and Lighting <br />Lump <br />Sum <br />1 N/A $_______.___ <br />6.Contaminated Soil <br />Removal, Disposal and <br />Replacement <br />Ton 100 $_____.___$_______.___ <br />7.Hazardous Waste <br />Materials Removal and <br />Disposal <br />Lump <br />Sum <br />1 N/A $_______.___ <br />8.Temporary Erosion and <br />Sediment Control <br />Lump <br />Sum <br />1 N/A $_______.___ <br />9.Trench Safety System Lump <br />Sum <br />1 N/A $_______.___ <br />10.Temporary Fencing Linear <br />Foot <br />537 $_____.___$_______.___ <br />11.Force Account <br />(Section 00 72 00) <br />-N/A N/A $500,000 <br />SUBTOTAL $______.___ <br />Washington State Sales Tax <br />@ 9.9%$______.___ <br />TOTAL BID $______.___ <br />1.3 ACCEPTANCE <br />A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid <br />closing date. <br />B. If this Bid is accepted by the Owner within the time period stated above, we will: <br />1. Execute the Agreement within 14 days of receipt of Notice of Award. <br />2. Furnish the required 100% payment and 100% performance bonds within 14 <br />calendar days of receipt of Notice of Award in the form described in Contract <br />Documents.
The URL can be used to link to this page
Your browser does not support the video tag.