My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 41 13 - 3 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 41 13 - 3 BID FORM <br />3. Submit to the City in pdf format within 14 calendar days of receipt of Notice of <br />Award the certificate of insurance and additional insured endorsements in <br />accordance with the Contract Documents. <br />4. Commence Work within seven calendar days after receipt of Notice to Proceed. <br />C. If this Bid is accepted within the indicated time, and we fail to commence the Work or <br />we fail to provide the required bonds, the Bid security shall be forfeited as damages to <br />the Owner by reason of our failure, limited in amount to the lesser of the face value of <br />the Bid security or the difference between this Bid and the Bid upon which Contract is <br />signed. <br />D. In the event our Bid is not accepted within the time stated above, the required Bid <br />security will be returned to the undersigned, according to the provisions of the <br />Instructions to Bidders, unless a mutually satisfactory arrangement is made for its <br />retention and validity for an extended period of time. <br />1.4 CONTRACT TIME <br />A. If this Bid is accepted, we will: <br />1. Begin work immediately after receiving Owner’s letter of Notice to Proceed and to <br />reach Substantial Completion within the dates required under the Contract <br />Documents. <br />2. Agree to pay liquidated damages to the City as stated in the Contract in the event <br />the project is not completed on or before required time periods. <br />3. Contract with the Owner using the Contract form provided herewith, on the terms <br />and conditions contained herein, to do everything necessary to complete the <br />construction of the project in the allotted time. <br />1.5 ADDENDA <br />A. Following Addenda have been received, and the modifications to the Bid Documents <br />noted below have been considered and all costs are included in the Bid. <br />Addendum No…………….., dated …………….. <br />Addendum No…………….., dated …………….. <br />Addendum No…………….., dated …………….. <br />Addendum No…………….., dated …………….. <br />1.6 BIDDER CERTIFICATIONS <br />A. Bidder, at the time of submitting this Bid and throughout the period of the contract, will <br />remain licensed by the state of Washington to perform the type of work required under <br />the Contract Documents. <br />B. Bidder is skilled and regularly engaged in the general class and type of work required <br />by the Contract Documents and has the capability to successfully manage construction <br />projects.
The URL can be used to link to this page
Your browser does not support the video tag.