My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Port Gardner Storage Facility - Demolition Package Table of Contents <br />Project No. 157889 1 <br />TABLE OF CONTENTS <br />VOLUME 1 SPECIFICATIONS <br />DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS <br />00 00 01 CONTACT LIST <br />00 11 13 ADVERTISEMENT FOR BIDS <br />00 21 13 INSTRUCTIONS TO BIDDERS <br />00 22 13 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br />00 25 13 PRE-BID MEETING <br />00 41 13 BID FORM <br />00 43 13 BID SECURITY FORM <br />00 43 36 PROPOSED SUBCONTRACTORS FORM <br />00 45 13 BIDDER QUALIFICATION STATEMENT <br />00 45 19 NON-COLLUSION AFFIDAVIT <br />00 45 39 RCW 35.22.650 CERTIFICATION <br />00 52 13 AGREEMENT FORM <br />00 61 13 PERFORMANCE BOND AND PAYMENT BOND <br />00 61 23 RETAINAGE BOND <br />00 61 25 RETAINAGE ESCROW AGREEMENT <br />00 63 25 SUBSTITUTION REQUEST FORM <br />00 63 63 CHANGE ORDER – AGREED <br />00 63 95 CHANGE ORDER – UNILATERAL <br />00 65 19 CERTIFICATE OF COMPLETION FORM <br />00 72 00 GENERAL CONDITIONS <br />00 73 00 SPECIAL CONDITIONS <br />00 73 43 WAGE RATE REQUIREMENTS <br />DIVISION 01 GENERAL REQUIREMENTS Engineer of <br />Record <br />01 11 00 SUMMARY OF WORK D. McBride <br />01 11 10 GEOTECHNICAL INFORMATION D. McBride <br />01 12 16 WORK SEQUENCE D. McBride <br />01 22 13 MEASUREMENT AND PAYMENT D. McBride <br />01 25 00 SUBSTITUTION PROCEDURES D. McBride <br />01 26 00 CONTRACT MODIFICATION PROCEDURES D. McBride <br />01 26 13 REQUESTS FOR INFORMATION (RFI)D. McBride <br />01 29 00 PAYMENT PROCEDURES D. McBride <br />01 29 73 SCHEDULE OF VALUES D. McBride <br />01 31 13 PROJECT COORDINATION D. McBride <br />01 31 19 PROJECT MEETINGS D. McBride <br />01 32 16 CONSTRUCTION PROGRESS SCHEDULE D. McBride <br />01 33 00 SUBMITTAL PROCEDURES D. McBride <br />01 35 29 HEALTH AND SAFETY D. McBride
The URL can be used to link to this page
Your browser does not support the video tag.