Laserfiche WebLink
Everett Port Gardner Storage Facility - Demolition Package Table of Contents <br />Project No. 157889 2 <br />DIVISION 01 GENERAL REQUIREMENTS Engineer of <br />Record <br />01 35 53 SECURITY PROCEDURES D. McBride <br />01 42 00 REFERENCES D. McBride <br />01 45 00 QUALITY CONTROL D. McBride <br />01 45 23 TESTING AND INSPECTION SERVICES D. McBride <br />01 50 00 TEMPORARY FACILITIES AND ENVIRONMENTAL CONTROLS D. McBride <br />01 60 00 MATERIALS AND EQUIPMENT D. McBride <br />01 72 29 CUTTING AND PATCHING D. McBride <br />01 74 23 FINAL CLEANING D. McBride <br />01 77 00 CLOSEOUT PROCEDURES D. McBride <br />01 78 23 OPERATION AND MAINTENANCE DATA D. McBride <br />01 78 36 WARRANTIES AND BONDS D. McBride <br />01 78 39 PROJECT RECORD DOCUMENTS D. McBride <br />01 99 90 REFERENCE FORMS D. McBride <br />DIVISION 02 EXISTING CONDITIONS Engineer of <br />Record <br />02 41 00 DEMOLITION AND SALVAGE D. McBride <br />02 61 00 REMOVAL AND DISPOSAL OF CONTAMINATED SOILS D. McBride <br />DIVISION 03 CONCRETE Engineer of <br />Record <br />03 11 00 CONCRETE FORMING G. Mazzotti <br />03 20 00 CONCRETE REINFORCING G. Mazzotti <br />03 30 00 CAST-IN-PLACE CONCRETE G. Mazzotti <br />03 60 00 GROUTING G. Mazzotti <br />DIVISION 05 METALS Engineer of <br />Record <br />05 05 20 ANCHOR BOLTS G. Mazzotti <br />DIVISION 26 ELECTRICAL Engineer of <br />Record <br />26 05 00 COMMON WORK RESULTS FOR ELECTRICAL D. Tucker <br />26 05 05 SELECTIVE DEMOLITION FOR ELECTRICAL D. Tucker <br />DIVISION 31 EARTHWORK Engineer of <br />Record <br />31 09 11 SETTLEMENT AND VIBRATION MONITORING A. Lawler <br />31 23 00 EXCAVATION AND FILL A. Lawler <br />31 23 19 DEWATERING A. Lawler <br />31 25 00 EROSION AND SEDIMENTATION CONTROL A. Lawler <br />31 50 00 EXCAVATION SUPPORT AND PROTECTION A. Lawler