My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Port Gardner Storage Facility - Demolition Package Table of Contents <br />Project No. 157889 3 <br />DIVISION 33 UTILITIES Engineer of <br />Record <br />33 01 30.16 TV INSPECTION OF PIPELINES A. Lawler <br />33 01 30.53 PIPELINE CLEANING A. Lawler <br />VOLUME 2 DRAWINGS <br />VOLUME 3 ATTACHMENTS <br />ATTACHMENT A SCOTT PAPER COMPANY AND KIMBERLY-CLARK AS-BUILT DRAWINGS <br />FOR PORT GARDNER STORAGE FACILITY SITE <br />ATTACHMENT B JUNE 2023 GEOTECHNICAL REPORT PORT GARDNER WET WEATHER DESIGN <br />ATTACHMENT C HWA GEOSCIENCES INC. CONCRETE CORING & LAB TESTING <br />FOR STRUCTURAL EVALUATION <br />ATTACHMENT D CORROSION PROBE, INC. OCTOBER/NOVEMBER 2022 CONDITION ASSESSMENT <br />ATTACHMENT E FLOYD SNIDER UTILITY PROPERTY CLEANUP ACTION PLAN MEMORANDUM <br />ATTACHMENT F TERRACON CONSULTANTS, INC. REGULATED BUILDING MATERIALS ASSESSMENT <br />ATTACHMENT G CITY OF EVERETT SOLID WASTE FACILITY PERMIT # PT0005247 (SW-393) <br />ATTACHMENT H PREVAILING WAGE FORMS
The URL can be used to link to this page
Your browser does not support the video tag.