<br /> PANEL P1 (BUILDING B)Exis PANEL SCHEDULE PROJECT: Silver Lake Elementary-BoilerReplace D P1 Existing PANEL SCHEDULE 1PROJECT SiI-rIke Element., Boiler Replace GENERAL NOTES
<br /> Electrical Consultants,Inc.
<br /> 120/208V,31oh,4W. 100A Bus M.L.O. SURFACE MOUNTED 23-Jan-23 120/208V,3Ph,4W. 600A Bus M.L.O. SURFACE MOUNTED 23-Jan-23 19015 36th Avenue West,Suite E
<br /> CkL Description 1 Load Load C.B. C.B. C B_ C_B. Load Load Description! Ckt. Ckt. Description I Load Load C.B. C.B. C.B. C.B. Load Load Description/ CkL 1. NOT ALL CONDUIT AND CONDUCTORS FOR BRANCH CIRCUITS HAVE BEEN SHOWN. IT IS THE RESPONSIBILITY Lynnwood,Washington 98036
<br /> No. Location A Type Am Pole Phase Am Pole A Type Location No. No. Location (VA) Type Amp Pole Phase Amp Pole (VA) Type Location No. OF THE CONTRACTOR SHALL INSTALL ALL REQUIRED CONDUIT AND WIRE FOR A COMPLETE INSTALLATION. Phone
<br /> (425)775-1799 FAX(425)774-9870
<br /> 1 REC-BOILER RM 36D R 20 1 A 20 1 SPARE 2 1 PANEL P4 15,200 SL 200 3 A SPACE 2
<br /> 3 LTG-BOILER RM 464 L 20 1 B 20 3 792 M CIRC PUMP#2 4 3 - 15,200 SL B SPACE 4 2. PROVIDE A DEDICATED NEUTRAL FOR ALL CONTROL WIRING.
<br /> 5 SPARE 20 2 C 792 M - 6 5 - 15,200 SL C SPACE 6
<br /> 7 - A 792 M - 8 7 PANELP3 8,710 SL 100 3 A 100 3 6,496 SL PANELPI 8 3. ALL WIRING SHALL BE CONCEALED IN CONDUIT. ALL CONDUIT SHALL BE CONCEALED IN FINISHED AREAS.
<br /> 9 TIMECLOCKS 10D C 20 1 B 20 3 792 M CIRC PUMP#1 10 9 - 8,710 SL B 7,332 SL - 10
<br /> 11 HEAT TIMER-BOILER 100 G 20 1 C 792 M - 12 11 - 8,710 SL C 5,510 SL - 12 4. HVAC CONTROLS-PROVIDE ALL CONDUIT FOR HVAC CONTROLS,AND ALL 120V CONTROL WIRING AS
<br /> 13 --.SHUNT TRIP... 20 1 A 792 M - 14 13 PANEL P2 9,360 SL 100 3 A 100 3 SPARE 14 REQUIRED BY THE MECHANICAL CONTROLS CONTRACTOR. COORDINATE REQUIREMENTS WITH
<br /> 15 AIR DRYER 830 G 20 1 B 20 3 421 M BOILER#1 16 15 - 9,360 SL B 16 MECHANICAL CONTRACTOR PRIOR TO BID.
<br /> 17 SPARE 20 1 C 421 M - 18 17 - 9,360 SL C 18
<br /> 19 WATER HEATER 840 WH 20 1 A 421 M - 20 19 WATER HEATER 8,000 WH 100 3 A SPACE 20 5. COORDINATE EQUIPMENT EQUIPMENT CONNECTION TYPES AND EXACT LOCATION PRIOR TO ROUGH-IN.
<br /> 21 WATER HEATER-PUMP 528 M 20 1 B M ...SHUNTTRIP... 22 21 - 8,000 WH B SPACE 22
<br /> 23 SPACE C 20 3 421 M BOILER#2 24 23 - 8,000 WH C SPACE 24 6. PROVIDE ALL CODE REQUIRED DISCONNECTING MEANS,AND CONNECTIONS TO EQUIPMENT.
<br /> 25 SPARE 20 3 A 421 M - 26 25 SPACE A SPACE 26
<br /> 27 - B 421 M - 28 27 SPACE B SPACE 28 7. CONDUIT ROUTING: CONDUIT ROUTING IS SHOWN AS A SUGGESTED METHOD. CONTRACTOR IS RESPONSIBLE
<br /> 29 - C M ...SHUNTTRIP... 30 29 SPACE C SPACE 30 TO ROUTE CONDUIT TO MINIMIZE CONFLICT WITH OTHER EQUIPMENT AND PENETRATIONS. PATCH
<br /> 31 ISPARE I 1 30 1 A 20 1 2 1 1 ISPARE 32 31 SPACE A SPACE 32 AND REPAIR ALL PENETRATIONS TO ORIGINAL CONDITION. SEE SPECIFICATIONS-
<br /> 33 SPARE 30 1 B 34 33 SPACE B SPACE 34
<br /> 35 SPARE A 1 C SPACE 36 35 SPACE C SPACE 36
<br /> 37 SPARE 20 1 A 50 3 2,670 SL PANEL M-3 38 37 SPACE A SPACE 38
<br /> 39 SPARE 20 1 B - - 2.984 SL_F_ 40 39 SPACE B SPACE 40 DEMOLITION NOTES:
<br /> 41 SPARE 20 1 C 2,984 SL - 42 41 SPACE I I ISPACE 42 PROJECT:
<br /> Total Connected Load_ Ph A 6496.0 VA 54.13 A Total Connected Load Ph A 47,766 VA 398 A 1. REMOVE ALL EXISTING ELECTRICAL EQUIPMENT,CONDUIT,AND WIRE BACK TO SOURCE,OR NEAREST UPSTREAM SILVER LAKE ELEMENTARY
<br /> Total Connected Load: Ph B 48,602 VA 405 A DEVICE NOT BEING REMOVED-ON SURFACES(WALLS,CEILINGS,FLOORS)BEING REMOVED AS PART OF THE
<br /> 01st Connected Load_ Ph B 7332.0 VA 61.10 A CONTRACT. REFER TO MECHANICAL AND ARCHITECTURAL DEMOLITION PLANS FOR EQUIPMENT REMOVED. BOILER REPLACEMENT
<br /> ata:Connected Load- Ph C 5510.0 VA 45.92 A Total Connected Load: Ph C 46,780 VA 390 A
<br /> Total Connected Load: 19.3 KVA Total Demand Load: 10.9 KVA Total Connected Load: 143.1 KVA Total Demand Load: 176.5 KVA 2. REMOVE BACK TO SOURCE,EXISTING LOW VOLTAGE CABLING,CABLE TRAY,RACEWAY,MOUNTING EQUIPMENT,
<br /> 53.7 AMPS 30.1 AMPS 397.6 AMPS 490.2 AMPS ETC.,WHICH IS ASSOCIATED WITH TEL/COMM,TV,CALL SYSTEMS,AND FIRE ALARM DEVICES BEING REMOVED.
<br /> Connected Total Demand Demand
<br /> Connected Subled Total Demand Demand 3. LEGALLY DISPOSE OF AND/OR RECYCLE MATERIAL BEING REMOVED AS REQUIRED BY STATE AND LOCAL
<br /> Loads Loads Loads(S) Loads Factor Load Loads Londa(s) Loeda Factor Load JURISDICTIONAL AUTHORITIES.
<br /> G General(Non-Continuous) 930.0 0 930.0 100% 9300 G General(Non-Continuous) 0 29,650 29,650 100% 29,650
<br /> L Lighting 464.0 0 464.0 125% 580.0 L Lighting 0 43,030 43,030 125% 53,788 4. MAINTAIN,REPAIR,OR REPLACE EXISTING SYSTEMS NOT BEING INTERRUPTED,BUT ARE AFFECTED BY
<br /> R Receptacles-to 10 KVA 360.0 0 360.0 100% 360.0 Accessories_ R Receptacles-to 10 KVA 0 15,780 10,000 100% 10.000 Accessories: DEMOLITION WORK.
<br /> over 10 KVA 0 0.0 50% 0.0 ver 10 KVA 0 5,780 50% 2,890
<br /> K Kitchen 0.0 0 0.0 100% 0.0 K Kitchen 0 26,100 26,100 100% 26,100 5. COORDINATE ANY TEMPORARY INTERRUPTIONS IN POWER WITH OWNER AND ARCHITECT. SUBMIT SCHEDULE TO
<br /> HHeating 0.0 0 0.0 100% 0.0 H Heating 0 0 0 100% 0 OWNER FOR APPROVAL,MINIMUM ONE WEEK PRIOR TO PROPOSED POWER INTERRUPTION.
<br /> M Motors 7,806.0 0 7,806.0 100% 7,806.0 M Motors 0 20,750 20,760 100% 20.750
<br /> LM Largest Motor 0.0 0 0.0 125% 0.0 LM Largest Motor 0 0 0 125% 0 6. FOR THE REPLACEMENT OF ANY EXISTING DEVICES WITH NEW-THE CONTRACTOR SHALL MODIFY,PATCH,AND
<br /> WH Water Heater 840.0 0 840.0 125% 1,D50.0 WH Water Heater 24,000 0 24,000 125% 30,000 REPAIR THE EXISTING SURFACE TO ACCOMMODATE NEW DEVICE OR LIGHTING FIXTURE. PROVIDE NEW
<br /> eral
<br /> C Continuous General Load 100.0 0 100.0 125% 125.0 C Contnuous GenLoad 0 2,630 2,630 125% 3,288 MOUNTING EQUIPMENT AND SUPPORT,AS REQUIRED. EXTEND CONDUITAND WIRE TO NEW DEVICE AS REQUIRED.
<br /> 10,500.1)VA 0 VA 10,500.0 VA 10,851.0 VA 24,000 VA 137,940 VA 161,940 VA 176,465 VA
<br /> 7. PATCH,REPAIR,AND PAINT EXISTING SURFACES THAT ARE AFFECTED BY REMOVAL OF EQUIPMENT,TO
<br /> ORIGINALCONDTRON. FIRE SEAL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. COORDINATE PAINT
<br /> COLOR WITH OWNER. REPAIR IS SUBJECT TO APPROVAL BY OWNER AND ARCHITECT.
<br /> PANEL P1 (BUILDING B)Revi PANEL SCHEDULE PROJECT: Silver Lake Elementary-BoilerReplace DPI Revised PANEL SCHEDULE PROJECT: S:NerLakeElementary-BoilerReplace LOCATION:
<br /> 12815 SYMBOL LEGEND EVERET,WA9-EVERETTHWY
<br /> 1201208V,3Ph,4W. 100A Bus M.L.O. SURFACE MOUNTED 23-Jan-23 120/208V,3Ph,4W. 600A Bus M.L.O. SURFACE MOUNTED 23Jan-23 EVERETT,WA 98208
<br /> CkL Description/ Load Load C.B. C.B. C.B. C.B. Load Load Description! Ckt. Ckt. Description) Load Load C.B. C.B. C.B. C.B. Load Load Description/ Ckt.
<br /> No. Location A Type Amp Pole Phase Amp Pole A Type Location No. No. Location (VA) Type Amp Pole Phase Amp Pole (VA) Type Location No.
<br /> 1 REC-BOILER RM 360 R 20 1 A 20 1 SPARE 2 1 PANEL P5 12,306 SL 200 3 A SPACE 2 POWER
<br /> 3 LTG-BOILER RM 464 L 20 1 B 20 3 SPARE 4 3 20,594 SL B SPACE 4
<br /> 5 SPARE 20 2 C 6 5 - 17,542 SL C SPACE 6
<br /> DUPLEX RECEPTACLE,GFCI TWE,WITH WEATHERPROOF COVER.
<br /> 7 - A 8 7 SPACE A 2002 3,270 PANEL D4 8
<br /> 9 TIMECLOCKS 100 C 20 1 B 20 1 840 M BOILER B-1 10 9 SPACE B - - 3,390 - 10 ® EQUIPMENT CONNECTION(INCLUDES CONDUCTORS,
<br /> 11 HEATTIMFR-BOILER 100 G 20 1 C 20 1 840 I' BOILER B-2 12 i 11 SPACE C SPACE 12 TERMINATIONS,GROUNDING CONDUCTOR,ETC.)
<br /> 3 _SHUNT TRIP... 20 1 A SPACE 14 13 SPACE A 200 3 SPARE 14
<br /> 15 20 1 B 25 3 2 6^ JIR
<br /> _6 C PUMP P-1 16 t 15 SPACE B - - SPARE 16 �' DISCONNECT SWITCH OR COMBINATION MOTOR STARTER/
<br /> 17 SPARE 20 1 C 18 17 SPACE C - - SPARE 18 DISCONNECT SWITCH.SEE EQUIPMENT SCHEDULES.SWITCH
<br /> 19 WATER HEATER B40 WH 20 1 A - - 2 .I -- 20 19 PANELP4 15,200 SL 150 3 A 100 3 11,406 SL IPANEL PI 20 SHALL INCLUDE ALL REQUIRED CONNECTIONS. (60)INDICATES
<br /> 21 WATER HEATER-PUMP 528 M 20 1 B 25 3 2 IA CIRC PUMP P-2 22 21 - 15,200 SL - - B - - 11,212 SL - 22 SWITCH AMPERAGE/(40)INDICATES FUSE AMPERAGE.
<br /> 23 SPACE C 2',:-: M - 24 23 - 15,200 SL C 10,220 SL - 24
<br /> t _25 BOILER PUMP BPA 1,040 M 15 2 A - - 2.628 M - 26 25 PANELP3 8,710 SL 100 3 A 100 3 9,360 SL IPANEL P2 26 G 208/120V PANELBOARD.
<br /> 27--- 1.040 M B SPACE 28 27 - 8,710 SL B 9,360 SL - 28
<br /> [1> 29 BOILER PUMP BP-2 1,040 M 15 2 C SPACE 30 29 - 8,710 SL - - C - - 9,360 SL - 30 1
<br /> 31 -- 1,040 M - - A SPACE 32 i 31 SPACE A SPACE 32 $ MANUAL MOTOR STARTER.SEE EQUIPMENT SCHEDULES.
<br /> 33 1 SPARE 30 1 B SPACE 34 33 SPACE B SPACE 34 s"
<br /> 35 SPARE 20 1 C SPACE 36 35 SPACE C SPACE 36
<br /> 37 SPARE 20 1 A 50 3 2,670 SL PANEL M-3 38 37 SPACE A SPACE 38 %
<br /> 39 SPARE 20 1 8 2,984L
<br /> - 40 39 SPACE B SPACE 40
<br /> 41 SPARE 1 1 20 1 1 1 C 2,984 SL - 42 41 SPACE C SPACE 42 emeea
<br /> Total Connected Load- Ph A 11406.0 VA 95.05 A Total Connected Load: Ph A 60,252 VA 502 A �
<br /> stat Connected Load- Ph B 11212.0 VA 93.43 A Total Connected Load: Ph B 68,466 VA 571 A
<br /> stat Connected Load_ Ph C 10220.0 VA 85.17 A Increased load_ Total Connected Load: Ph C 81,032 VA 509 A ocreased load: SHEET INDEX
<br /> Total Connected Load: 32.8 KVA Total Demand Load: 24.4 KVA 13.5 KVA Total Connected Load: 189.8 KVA Total Demand Load: 161.0 KVA 13.5 KVA
<br /> 91.2 AMPS 67.6 AMPS 37.5 AMPS 527.1 AMPS 447.3 AMPS 37.5 AMPS gu
<br /> EO.0 COVER SHEET
<br /> Connected Subled Total Demand Demand Connected subled Total Demand Demand E1.0 ELECTRICAL DEMOLITION&INSTALLATION PLAN
<br /> LoadsLoads(S) Loads Factor Load Loads Loads(S) Loads Factor Load E5.0 ONE-LINE DIAGRAM
<br /> G General(Non-Continuous) 100.0 0 100.0 100% 100.0 G General(Non-Continuous) 0 28.820 28,820 100% 28,82D rY A.
<br /> L Lighting 464.0 0 464.0 125% 580.0 L Lighting 0 43,D30 43,030 125% 53,768 .v
<br /> R Receptacles-to 10 KVA 360.0 0 360.0 100% 360.0 Accessories: R Receptacles-o 10 KVA 0 15,780 10,000 100% 10,000 Accessories:
<br /> over 10 KVA 0 0.0 50% 0.0 oyer 10 KVA 0 5,780 50% 2,890
<br /> K Kitchen 0.0 0 0.0 100% 0.0 K Kitchen 0 26.100 26,100 100% 26,100 a]
<br /> HHeating 0.0 0 0.0 100% 0.0 H Heating 0 0 0 100% D DETAIL NOTES
<br /> M Motors 22,136.0 0 22,136.0 100% 22,1360 M Motors 0 35,080 35,080 100% 35,080
<br /> LM Largest Motor 0.0 0 0.0 125% 0.0 LM Largest Motor o 0 0 125% o D PROVIDE NEW CIRCUIT BREAKER.MATCH TYPE AND AIC RATING(SIEMENS).
<br /> WH WaterHeater 840.0 0 840.0 125% 1,D50.0 WH Water Heater 0 840 840 125% 1,050 L
<br /> C Continuous General Load 100.0 0 100.0 125% 125.0 C Continuous General Load 0 2.630 2,630 125% 3,288
<br /> 24,000.0 VA 0 VA 24,000.0 VA 24,351.0 VA 0 VA 152,280 VA 152,280 VA 161,015 VA
<br /> COVER SHEET
<br /> t�
<br /> CD
<br /> O
<br /> N
<br /> \ we
<br /> N
<br /> I__ son MBR
<br /> N E0.0
<br /> 0
<br /> www.awaelec.com 9 AWA,INC.
<br /> e idad to mild-E.or wA, mom. For C-dici-Agaaa www.bxwa.cont-Always v fy soot
<br />
|