PROJECT: City of Everett <br />WFP EMERGENCY GENERATOR REPLACMENT - WO UP-3587 <br /> <br />WORK CHANGE DIRECTIVE – No. 001 <br />DATE OF ISSUANCE: October 10, 2022 <br /> <br />You are directed to proceed promptly with the following change (s): <br /> <br />Add (1) 1 ¼” galvanized rigid conduit between the Operations Building and the MCC room in the <br />Location 1 Generator Building. <br /> <br />Payment shall be lump sum and billed to Bid Item No. 20, Force Account. <br /> <br />Purpose of WCD-001: <br />There are not enough conduits between the Operations Building and the Location 1 Generator <br />Building to install the per plan new conductors. In order to maintain code compliance with conduit fill, <br />an additional 1 ¼” conduit is needed. <br /> <br />Attachments: (List documents supporting change): Service Electric Proposal #1. <br /> <br /> <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br /> <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> <br /> Lump Sum Contractor’s records <br /> <br /> Time and Material Engineer’s records <br /> <br /> Other - Other <br /> <br /> <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$10,307.27 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further authorization. <br /> <br /> <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br /> <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br /> <br />Page 1 of 1