IMCO General Construction, Inc 2/8/2024 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc 2/8/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:06:51 PM
Creation date
2/8/2024 12:23:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc
Approval Date
2/8/2024
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003461
Total Compensation
$556,438.88
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction Inc. 8/27/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PROJECT: City of Everett <br />WFP EMERGENCY GENERATOR REPLACMENT - WO UP-3587 <br /> <br />WORK CHANGE DIRECTIVE – No. 001 <br />DATE OF ISSUANCE: October 10, 2022 <br /> <br />You are directed to proceed promptly with the following change (s): <br /> <br />Add (1) 1 ¼” galvanized rigid conduit between the Operations Building and the MCC room in the <br />Location 1 Generator Building. <br /> <br />Payment shall be lump sum and billed to Bid Item No. 20, Force Account. <br /> <br />Purpose of WCD-001: <br />There are not enough conduits between the Operations Building and the Location 1 Generator <br />Building to install the per plan new conductors. In order to maintain code compliance with conduit fill, <br />an additional 1 ¼” conduit is needed. <br /> <br />Attachments: (List documents supporting change): Service Electric Proposal #1. <br /> <br /> <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br /> <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> <br /> Lump Sum Contractor’s records <br /> <br /> Time and Material Engineer’s records <br /> <br /> Other - Other <br /> <br /> <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$10,307.27 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further authorization. <br /> <br /> <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br /> <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br /> <br />Page 1 of 1