Laserfiche WebLink
PROJECT: City of Everett <br />WFP EMERGENCY GENERATOR REPLACEMENT WO No. 3587 <br /> <br />WORK CHANGE DIRECTIVE – No. 005 <br />DATE OF ISSUANCE: JANUARY 11, 2023 <br /> <br />You are directed to proceed promptly with the following change (s): <br /> <br />Description: <br /> <br /> <br />Purpose of WCD-005: Bid Item 11 included 75 LF of waterline removal and relocation. The <br />waterline did not conflict with the new construction. Removal and relocation of the waterline <br />was not needed. It is anticipated that additional funds will be needed in Bid Item 20. The funds <br />for the waterline removal and relocation are being transferred from Bid Item 11 to Bid Item 20. <br />Attachments: <br /> <br /> <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br /> <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> <br /> Lump Sum Contractor’s records <br /> <br /> Time and Material Engineer’s records <br /> <br /> Other - Other <br /> <br /> <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract <br />Times: <br />$0.00 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further <br />authorization. <br /> <br /> <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br /> <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br /> <br />Page 1 of 1