My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc 2/8/2024 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc 2/8/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:06:51 PM
Creation date
2/8/2024 12:23:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc
Approval Date
2/8/2024
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003461
Total Compensation
$556,438.88
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction Inc. 8/27/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />PROJECT: City of Everett <br />WFP EMERGENCY GENERATOR REPLACEMENT WO No. 3587 <br />WORK CHANGE DIRECTIVE – No. 008 <br />DATE OF ISSUANCE: August 16, 2023 <br />You are directed to proceed promptly with the following change (s): <br />Description: Procure, size and install a new actuator for the existing louver/damper in the <br />Location 1 generator room, south wall. The actuator shall be sized to match the existing Duff- <br />Norton actuator, submittal information is attached. During a power failure, the new actuator <br />shall fail in an opened position. <br />Purpose of WCD-008: Existing actuator is 40-years old and unreliable. The Costs will be <br />tracked on a time and materials basis. Payment will be made through Bid Item #20, Force <br />Account. <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> Lump Sum Contractor’s records <br /> Time and Material Engineer’s records <br /> Other - Other <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$4424.00 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further authorization. <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br />Page 1 of 1 <br />11-7-2023
The URL can be used to link to this page
Your browser does not support the video tag.