Laserfiche WebLink
Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />PROJECT: City of Everett <br />WFP EMERGENCY GENERATOR REPLACEMENT WO No. 3587 <br />WORK CHANGE DIRECTIVE – No. 008 <br />DATE OF ISSUANCE: August 16, 2023 <br />You are directed to proceed promptly with the following change (s): <br />Description: Procure, size and install a new actuator for the existing louver/damper in the <br />Location 1 generator room, south wall. The actuator shall be sized to match the existing Duff- <br />Norton actuator, submittal information is attached. During a power failure, the new actuator <br />shall fail in an opened position. <br />Purpose of WCD-008: Existing actuator is 40-years old and unreliable. The Costs will be <br />tracked on a time and materials basis. Payment will be made through Bid Item #20, Force <br />Account. <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> Lump Sum Contractor’s records <br /> Time and Material Engineer’s records <br /> Other - Other <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$4424.00 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further authorization. <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br />Page 1 of 1 <br />11-7-2023