My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc 2/8/2024 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc 2/8/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:06:51 PM
Creation date
2/8/2024 12:23:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc
Approval Date
2/8/2024
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003461
Total Compensation
$556,438.88
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction Inc. 8/27/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
GENERATORGENERATORCONTROLLERSDAY TANKSSFROM DUPLEXPUMP SETRETURNPUMPSETDAY TANKCONTROLPANEL115V AC,30 AMP CIRCUITMODBUS RS-485 3-CONDUCTORSHIELDED CABLE TO CSI PANELPUMP RUN CONTACTS, 24V DC,FROM DAY TANK TO PUMP SETTERMINALS TB 'C' 1 / 2 / 3SOLENOID FILL VALVEWIRE TO TB 'S1' 1 / 2 / 3AND TB 'S2' 1 / 2 / 3 INDAY TANK CONTROLLERRETURN/OVERFLOWTO MAIN TANK24V DC SOLENOID VALVEACTUATED BY GENERATORCONTROLLER24V DC TO GENERATORCONTROLLERCRITICALLOW LEVELSWITCHWILSON/ROGERS & ASSOCIATES2006 196th St. SW, #120Lynnwood, WA 98036PHONE:EMAIL:WEBSITE:1 (888) 851-7275sales@wilsonrogers.comwww.wilsonrogers.com1.0DWG NO.PROJECT TITLEREV NO.0.0EVERETT PUBLIC WORKS - WATER FILTER PLANT EMERGENCYGENERATOR REPLACEMENTSHEET TITLESITE ADDRESSCONTRACTORENGINEERDATESCALEDRAWN BYCHECKED BY08-20-2023NONEJDB-NOT FOR CONSTRUCTIONNO.DATEBYDESCRIPTION- REVISIONS -DAY TANKIMCO--NOT TO SCALE
The URL can be used to link to this page
Your browser does not support the video tag.