My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc 2/8/2024 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc 2/8/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:06:51 PM
Creation date
2/8/2024 12:23:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc
Approval Date
2/8/2024
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003461
Total Compensation
$556,438.88
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction Inc. 8/27/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
All material herein © 2003-2023 Randall-Reilly All rights reserved.Page 1 of 1 <br />October 16, 2023 <br />4X4Axle Configuration ConventionalCab Type <br />360.0Horsepower DieselPower Mode <br />1 1/2Ton Rating <br />www.equipmentwatch.com <br />All prices shown in US Dollars ($) <br />Adjustments for ST0295 in All Saved Models <br />Miscellaneous 4X4 1 1/2 360 CONV DIESEL <br />On-Highway Light Duty Trucks <br />Size Class: <br />300 hp & Over <br />Weight: <br />N/A <br />Configuration for 4X4 1 1/2 360 CONV DIESEL <br />Blue Book Rates <br />** FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. <br />Ownership Costs Estimated Operating <br />Costs <br />FHWA Rate** <br />Monthly Weekly Daily Hourly Hourly Hourly <br />Published Rates USD $1,230.00 USD $345.00 USD $86.00 USD $13.00 USD $23.48 USD $30.47 <br />Adjustments <br />Region ( Washington: <br />103.7%) <br />USD $45.51 USD $12.77 USD $3.18 USD $0.48 <br />Model Year (2022: 99.97%)(USD $0.34)(USD $0.10)(USD $0.02)(USD $0.00) <br />Adjusted Hourly Ownership <br />Cost (100%) <br />---- <br />Hourly Operating Cost (100%)- <br />Total:USD $1,275.17 USD $357.67 USD $89.16 USD $13.48 USD $23.48 USD $30.73 <br />Non-Active Use Rates Hourly <br />Standby Rate USD $5.65 <br />Idling Rate USD $26.21 <br />Rate Element Allocation <br />Element Percentage Value <br />Depreciation (ownership)56%USD $688.80/mo <br />Overhaul (ownership)22%USD $270.60/mo <br />CFC (ownership)10%USD $123.00/mo <br />Indirect (ownership)12%USD $147.60/mo <br />Fuel (operating) @ USD 4.39 80.75%USD $18.96/hr <br />Revised Date: 4th quarter 2023 <br />These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match Rental Rate Blue <br />Book Print. Visit the Cost Recovery Product Guide on our Help page for more information. <br />The equipment represented in this report has been exclusively prepared for CHRIS PEACH <br />(cpeach@imcoconstruction.com)www.equipmentwatch.com
The URL can be used to link to this page
Your browser does not support the video tag.