<br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />PROJECT: City of Everett <br />WFP EMERGENCY GENERATOR REPLACEMENT WO No. 3587 <br /> <br />WORK CHANGE DIRECTIVE – No. 011 <br />DATE OF ISSUANCE: September 28, 2023 <br /> <br />You are directed to proceed promptly with the following change (s): <br /> <br />Description: At Location 2, procure and install 7-new breakers for the pump motors and 1-new <br />breaker for the feed to MCC HFWPSG, in FWPS 1. Breakers for pump motors shall be Eaton <br />Catalog # MDS3800F or equal, Series C, 3-pole, 800A Max, with an AIC of 65K at 480V. Breaker <br />for MCC HFWPSG shall be Eaton Catalog # HLDB3600FT33W or equal, Series C, 3-pole, 600A <br />Max, with an AIC of 65K at 480V. Provide Frames only, the existing trip units will be reused. <br /> <br />Purpose of WCD-011: The AIC rating of the existing pump motor breakers and feed to MCC <br />HFWPSG is 35K amps. The breakers in the new switchgear, that supply power to the existing <br />brakers, have an AIC rating of 65K amps. If the existing breakers are exposed to 65K amps, <br />they could be fused in the closed position and unable to interrupt the flow of electricity to the <br />pump motors and MCC HFWPSG. WCD-11 replaces the 35K breakers with 65K breakers. <br /> <br /> <br /> <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br /> <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> <br /> Lump Sum Contractor’s records <br /> <br /> Time and Material Engineer’s records <br /> <br /> Other - Other <br /> <br /> <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$175,000.00 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further authorization. <br /> <br /> <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br /> <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br />Page 1 of 1