My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc 2/8/2024 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc 2/8/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:06:51 PM
Creation date
2/8/2024 12:23:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc
Approval Date
2/8/2024
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003461
Total Compensation
$556,438.88
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction Inc. 8/27/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />PROJECT: City of Everett <br />WFP EMERGENCY GENERATOR REPLACEMENT WO No. 3587 <br /> <br />WORK CHANGE DIRECTIVE – No. 011 <br />DATE OF ISSUANCE: September 28, 2023 <br /> <br />You are directed to proceed promptly with the following change (s): <br /> <br />Description: At Location 2, procure and install 7-new breakers for the pump motors and 1-new <br />breaker for the feed to MCC HFWPSG, in FWPS 1. Breakers for pump motors shall be Eaton <br />Catalog # MDS3800F or equal, Series C, 3-pole, 800A Max, with an AIC of 65K at 480V. Breaker <br />for MCC HFWPSG shall be Eaton Catalog # HLDB3600FT33W or equal, Series C, 3-pole, 600A <br />Max, with an AIC of 65K at 480V. Provide Frames only, the existing trip units will be reused. <br /> <br />Purpose of WCD-011: The AIC rating of the existing pump motor breakers and feed to MCC <br />HFWPSG is 35K amps. The breakers in the new switchgear, that supply power to the existing <br />brakers, have an AIC rating of 65K amps. If the existing breakers are exposed to 65K amps, <br />they could be fused in the closed position and unable to interrupt the flow of electricity to the <br />pump motors and MCC HFWPSG. WCD-11 replaces the 35K breakers with 65K breakers. <br /> <br /> <br /> <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br /> <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> <br /> Lump Sum Contractor’s records <br /> <br /> Time and Material Engineer’s records <br /> <br /> Other - Other <br /> <br /> <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$175,000.00 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further authorization. <br /> <br /> <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br /> <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.