Laserfiche WebLink
Drew Martin <br />From: Drew Martin <br />Sent: Tuesday, December 7, 2021 9:32 AM <br />To: 'tauriol@comcast.net' <br />Subject: City of Everett Permit Services: 6902 Columbia Avenue (132110-057) -First Building Intake <br />Review <br />Attachments: 2018 IRC-Typical Code References_04-12-2021.docx; CoE_Residential Drawing <br />Preparation -Edited 09-27-2021.pdf <br />Hello, Tyler. <br />Your application has been received and a permit set up. However, the submitted documents are not <br />sufficiently developed for us to perform a comprehensive review at this time. <br />Information is attached to provide guidance. Construction -level documents should be submitted for <br />review. Two complete sets of the revised drawings should be submitted to replace the previously submitted <br />drawing sets. Preliminary comments are provided below to assist in preparing the drawings, but these are not <br />intended to provide a comprehensive review. The resubmittal documents should include an itemized <br />response letter clarifying how the review comments below have been addressed. Depending on your <br />experience with the adopted codes and preparing documents, we recommend consulting with a design <br />professional to assist you. <br />Intake Review Comments: <br />General: <br />1. The submitted documents include sketches for the proposed project. Construction -level drawings <br />prepared using established drafting standards are required to substantiate compliance with the IRC. The <br />drawings should be prepared using a standard scale (e.g, %"=1'-0") and be printed on a paper size <br />consistent with the drawing scale(s). The drawings should include plans, building sections, details, <br />material specifications, design loads, architectural and structural notes, etc. as needed to clearly show the <br />proposed work. See IRC Section R106.1.1. <br />2. The construction drawings should include the entire house. Detailed construction information is not <br />required for areas that are not included in the proposed scope -of -work. At a minimum, the plans should <br />show the walls, doors, egress routes, windows including egress windows, smoke and CO alarms, and use of <br />each room. See IRC Section R106.1.1. <br />3. The project should specify the applicable building codes, including but not limited to the 2018 IRC, 2018 <br />WSEC, and the 2018 IBC. See Section R106.1.1 and EMC Section 16.005.030. <br />4. The project should specify the correct address on each sheet of the construction drawings. The address is <br />6902 Columbia Court per the City of Everett records. Note that addresses are established by the City of <br />Everett, not Snohomish County. See IRC Section R106.1.1. <br />