Laserfiche WebLink
• <br /> • Prep and paint walls, ceilings, doors,counters, cabinets, and trim per spec in the <br /> Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • C-tops to be prepped and coated per specification <br /> • Remove FRP or tile,where applicable <br /> • Patching, sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • Excessive, non-repairable,damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> 3rd FLOOR <br /> • 3rd Floor Corridor <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • Work is to be coordinated around high resident traffic hours <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls, handrails, corridor side of doors, ceiling,and trim/door casing <br /> per spec in the Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • Patching, sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • Excessive, non-repairable,damage to be reviewed on a case by case basis <br /> o Lighting: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> o Ceiling: <br /> • Account for removal and replacement of exit signs,WAPS,smoke detectors, etc. <br /> • Provide add/alt for exit sign replacement if condition warrants <br /> • Include removal of all ceiling HVAC vents, cleaning, repaint, and reinstall <br /> • Community Room <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • Work is to be coordinated around high resident traffic hours <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls,ceiling, door, and trim per spec in the Wall Finish Schedule <br /> Ve2.k 5 Effective Date: 9/8/2022 <br />