• • <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls, ceiling, and trim per spec in the Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • Patching, sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> • Installation of low voltage items per the Power Plans, by others <br /> • Bathroom(1) <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls,ceilings, doors,and trim per spec in the Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • Remove FRP and tile where applicable <br /> • Patching,sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • Excessive, non-repairable,damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> o Vanities and Fixtures: <br /> • Construct new ADA vanities per the millwork details within the architectural plans <br /> • Replace sink, faucets,vanity mirror,grab bar, and toilet paper holder per spec <br /> • Replace toilet per specification <br /> • General Contractor to provide new water supply lines, p-traps and ADA wrap <br /> • NOTE: Owner will furnish paper towel and soap dispensers Specs Pending <br /> • Laundry Rooms(2) <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • Remove/re-install washers and dryers with new water supply hoses and hard <br /> exhaust vent ducting <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> (:`J 15 Effective Date: 9/8/2022 <br />