• • <br /> ■ Prep and paint walls, ceiling, door, and trim per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable,damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> ■ Furnish/install lighting per Reflected Ceiling Plan <br /> ■ Installation of low voltage items per the Power Plans, by others <br /> o Millwork: <br /> ■ Furnish/install new cabinetry and counters in the locations identified in the <br /> architectural plans per the millwork details. <br /> ■ Provide in-wall blocking as needed and mount TV in location identified within the <br /> architectural plan <br /> • Staff Lounge Bathroom <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> ■ Prep and paint walls,ceilings, doors, and trim per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Remove FRP where applicable <br /> ■ Patching, sanding and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Vanities and Fixtures: <br /> ■ Install new wall mounted sink per spec <br /> ■ Replace faucets,vanity mirror, grab bar, and toilet paper holder per spec <br /> ■ Replace toilet to specification <br /> ■ General Contractor to provide new water supply lines <br /> ■ NOTE: Owner will furnish paper towel and soap dispensers <br /> • Bathroom (1) <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager. <br /> o Paint: <br /> ■ Prep and paint walls,ceilings, doors, and trim per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Remove FRP and tile where applicable <br /> ■ Patching, sanding and/or caulking as needed <br /> '� 115 Effective Date:9/8/2022 <br />