My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3915 COLBY AVE 2024-02-09
>
Address Records
>
COLBY AVE
>
3915
>
3915 COLBY AVE 2024-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:37:07 PM
Creation date
2/9/2024 1:36:44 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3915
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • r , <br /> •,: lighting <br /> o` General Contractor to furnish and install lighting per the Reflected Ceiling Plan and spec <br /> schedule in all areas including stairwells. <br /> • Interior Signage <br /> o Furnished by Atria <br /> o General Contractor to install per the signage company instructions and per ADA <br /> Requirements. <br /> • Kickplates <br /> o Supply and install kickplates to all resident unit entry and common area restroom doors. <br /> Kickplate is to be a brushed finish that matches existing hardware color and size to be called <br /> out by PM based on existing size, installed 2" above the bottom of the door. <br /> • Stairwells <br /> o Prep and paint walls,doors, and ceilings per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding, and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> o Install lighting per Reflected Ceiling Plan <br /> o Install flooring per floor finish plan <br /> • Exterior <br /> o PM/GC to identify location(s)for dumpsters and material storage containers(where <br /> applicable) <br /> o PM/GC to identify parking locations for the construction team <br /> • IT <br /> o Atria IT will handle network and cable installation <br /> o Data connections and outlets will be provided per drawings <br /> • Elevators <br /> 1 Elevator <br /> Flooring: <br /> o Remove and properly dispose of existing flooring <br /> o Prep subfloor as needed and per manufacturers specifications. <br /> o Furnish/install new flooring and base per the Floor Finish Plan <br /> Walls: <br /> o Remove cab wall hangings <br /> o Install specified Fab A Cab interior. <br /> Effective Date: 9/8/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.