Laserfiche WebLink
• • r , <br /> •,: lighting <br /> o` General Contractor to furnish and install lighting per the Reflected Ceiling Plan and spec <br /> schedule in all areas including stairwells. <br /> • Interior Signage <br /> o Furnished by Atria <br /> o General Contractor to install per the signage company instructions and per ADA <br /> Requirements. <br /> • Kickplates <br /> o Supply and install kickplates to all resident unit entry and common area restroom doors. <br /> Kickplate is to be a brushed finish that matches existing hardware color and size to be called <br /> out by PM based on existing size, installed 2" above the bottom of the door. <br /> • Stairwells <br /> o Prep and paint walls,doors, and ceilings per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding, and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> o Install lighting per Reflected Ceiling Plan <br /> o Install flooring per floor finish plan <br /> • Exterior <br /> o PM/GC to identify location(s)for dumpsters and material storage containers(where <br /> applicable) <br /> o PM/GC to identify parking locations for the construction team <br /> • IT <br /> o Atria IT will handle network and cable installation <br /> o Data connections and outlets will be provided per drawings <br /> • Elevators <br /> 1 Elevator <br /> Flooring: <br /> o Remove and properly dispose of existing flooring <br /> o Prep subfloor as needed and per manufacturers specifications. <br /> o Furnish/install new flooring and base per the Floor Finish Plan <br /> Walls: <br /> o Remove cab wall hangings <br /> o Install specified Fab A Cab interior. <br /> Effective Date: 9/8/2022 <br />