• . } Y <br /> o Ceiling Tiles: <br /> • Remove and properly dispose of existing ACT <br /> • Furnish/install new ACT per Finish Schedule <br /> • Grid to remain—will discuss the need for repairs or painting on a case by case basis <br /> • Account for removal and replacement of exit signs, WAPS,smoke detectors,etc. <br /> • Include removal of all ceiling metal vents, cleaning, repaint, and reinstall <br /> • Atrium Club <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • Work is to be coordinated around high resident traffic hours <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls and trim per spec in the Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • Patching, sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Lighting: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> o Millwork: <br /> • Furnish and install decorative screens in the locations identified in the architectural <br /> plans per the millwork details. <br /> o Provide in-wall blocking as needed and mount TV in location identified within the <br /> architectural plan <br /> o Remove existing planters. Finish face to match fascia below and adjoining <br /> • Multi-Purpose <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • Work is to be coordinated around high resident traffic hours <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls,ceilings, doors,and trim per spec in the Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • Patching, sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • Excessive, non-repairable, damage to be reviewed on a case-by-case basis <br /> o Fireplace: Where applicable.IDPM/PM to Specify <br /> • DR: Replace existing face in DR with ceramic tile (per original spec) <br /> Effective Date: 9/8/2022 <br />