Laserfiche WebLink
• • <br /> • Multi-purpose: Marble: Paint the mantle. Brick: paint brick and mantle(mantle = PT- <br /> 03, brick= PT-02). Stone:take ID's lead based on what they find. <br /> • Include updates in redline. <br /> • Remove existing mantel and surround <br /> • Remove face of hearth if not integral to the structure <br /> • Install tile and mantel specs per details in the architectural plans and finish <br /> schedule <br /> o Lighting: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> o Storage: Where applicable <br /> • Construct new partitions and doors per details noted in architectural plans <br /> • General contractor to furnish new door,trim, and hardware per spec schedule <br /> • General Contractor to supply and install new electrical devices per drawings <br /> • Installation of low voltage items per the Power Plans, by others <br /> o Kitchenette: <br /> • Replace existing cabinetry and construct island (if applicable) per millwork details <br /> within the architectural plans <br /> • Replace fixtures per spec schedule <br /> • Replace appliances per spec schedule <br /> • General Contractor to confirm identified appliances will fit within their <br /> respective locations per the dimensions listed in the millwork details <br /> o Provide in-wall blocking as needed and mount TV in location identified within the <br /> architectural plan <br /> • Dining Room:Area Will Require After-Hours Work <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • Work is to be coordinated around high resident traffic hours <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls,ceilings, dining room side of doors, and trim per spec in the <br /> Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • Patching, sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • If applicable, remove FRP,wainscoting and corner guards from columns,prep,and <br /> paint. Replace with new corner guards to specification. <br /> • Excessive, non-repairable,damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> • Furnish/install/relocate low voltage items per the PM as needed <br /> o Fireplace: <br /> • Remove existing mantel and surround <br /> • Remove face of hearth if not integral to the structure <br /> Effective Date: 9/8/2022 <br />