My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1318 75TH ST SE 2024-03-01
>
Address Records
>
75TH ST SE
>
1318
>
1318 75TH ST SE 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 3:57:39 PM
Creation date
2/13/2024 11:03:33 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
1318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HVAC Sysifem Duct Leask"it Testlng /R109.9) <br />Cteh one <br />handaf In conditioned space? (See Option 4.21 <br />V or N <br />All ductwork and ak agt <br />All ductwork In uncondlborwd spaces buried and tested at 3% total task <br />and err V or N <br />hardier In conditioned space? (Sao Option 4.1.) <br />R-8? Y or N <br />All ductwork & air handler outside cordfbened spec a Insulated to minimum <br />Y or N <br />Air handler at duct leakage test? (Total leakage a% If yes. 3% If no) <br />present <br />V or N <br />HVAC leaks a to outside test conducted at final? <br />Y or N <br />Do HVAC duct leakage tests Include GPS and time stamp verification? <br />HVAC system leakage test calculated design target: <br />CFM ag 28 Pa <br />HVAC system leakage lost measured results: <br />_ CFM Q 25 Pa <br />8uildlTtg Leakage Testlrtg (RI03.1.1.1) <br />Dwelling unn leakage test calculated design target: <br />ACM C 60 Ps <br />Dwelling unit leakage test. measured results. <br />ACH Q SO Pa <br />Whde Building Leakage test (R2 corridor only) design target. <br />_ CPMisf a 50 Pa <br />Whole Budding Leakage test IR2 corridor only) measured. <br />CFMisf a 50 Pa <br />Do buildin leaks a tests Include GPS and time stain verificatlon? <br />Y or N <br />Wbote House Venfllabron System Measured Flow Rafts (Aft SMA MC -WA) <br />farces one <br />Ara the system controls correctly labeled? <br />Y Or N <br />The Whole House Ventilation (WHV) system operation and maintenance (O&M) Y or N <br />instructions; were provided to the building owner? <br />ProvlMd to: on <br />(date) <br />Whole House VOmllabOn System Type: ;Circle oiie� <br />(1) Whole house exhaust fan. location <br />(2) Balanced HRVi ERV, location <br />For R2 low -net serves more than one unit? <br />y or N <br />(3) Supply or HRV WHV integral to the au handler. Descnbe system control sequence of <br />operations or reference to design submittal. <br />Specify run-time: _hours per day <br />C= M <br />WHV calculated design minimum How rate per plan submittal: <br />WHV measured min flow rate at commisaloning: Exhaust CFM. Supply __CFM <br />DO WNV flow tests include GPS & time stamp venticatlM? <br />HRVfERV sensible heal necgvery elflciency: <br />Y or N <br />Commissioning Notes. <br />Other Mandatory Requ/romembs <br />Cexw one <br />NI other mandatory requirements of W SEC-R have been met? <br />Y N <br />or <br />Prof <br />Bull <br />Bull <br />Atli <br />
The URL can be used to link to this page
Your browser does not support the video tag.