Laserfiche WebLink
� HAREZLAK <br />■ ENGINEERING <br />JOB MOON RES <br />SHEET NO. SK_4 <br />CALCULATED BY PAH <br />CHECKED BY <br />SCALE NTS <br />OF_ <br />DATE <br />DATE <br />(E) INSTALLED FRAMING <br />TO BE REVIEWED IN <br />THE FIELD TO COMPLY <br />WITH STRUCTURAL <br />DRAWINGS <br />(E) TJI JOISTS <br />INSTALLED ON <br />CANTILEVERED SILL <br />PLATE ARE NOT <br />ACCEPTABLE. <br />CONTRACTOR TO FULLY INSTALL <br />EA. JOIST HANGER TO NEW <br />LEDGER. INSTALL GALVANIZED <br />NAILS, FILL ALL JOIST HANGER <br />HOLES. SEE STUCTURAL <br />DRAWINGS AND GENERAL <br />STRUCTURAL NOTES FOR <br />INFORMATION NOT NOTED. <br />(N) PT 2x10 LEDGER INSTALLED <br />BELOW (E) SILL PLATE. INSTALL <br />WITH 5/8" DIAMETER x 8" LONG <br />TITEN HD ANCHOR @ 12" OC <br />LEDGER TO (E) STEM WALL. <br />CONTRACTOR TO INSTALL (2) <br />SHEETS OF BUILDING PAPER <br />BETWEEN THE STEM WALL AND <br />THE LEDGER. <br />PRODUCT 20' <br />