Laserfiche WebLink
� HAREZLAK <br />■ ENGINEERING <br />LEDGER PER SK-4 <br />INSTALL(N)FULL <br />HEIGHT BLKG EA. <br />SIDE OF PSL BEAM. <br />END NAIL BLKG TO <br />BEAM AND <br />AJDACENT JOISTS. <br />TOE NAIL BEAM TO <br />POSTS BELOW. <br />JOB MOON RES <br />SHEET NO. SK-5 <br />CALCULATED BY PAH <br />CHECKED BY <br />SCALE NTS <br />OF_ <br />DATE <br />DATE <br />(E) INSTALLED FRAMING <br />TO BE REVIEWED IN <br />THE FIELD TO COMPLY <br />WITH STRUCTURAL <br />DRAWINGS <br />(E) TJI JOISTS <br />INSTALLED ON <br />CANTILEVERED SILL <br />PLATE ARE NOT <br />ACCEPTABLE. <br />(E) 5.25 x 16 PSL w/ UNKNOWN <br />HANGER AND INSTLLATION INTO <br />(E) STEM WALL. <br />(N)-(2) 2x6 FULL HEIGHT STUDS, <br />SISTERED TO EA. OTHER w/ (2) <br />16d NAILS @ 12" OC FULL <br />HEIGHT. PROVIDE MINIMUM (2) <br />STUDS BELOW THE BEAM. <br />(N) PT 2x6 STUD w/ X-CP 72 P8 <br />S23 w/ 1.33" EMBED INTO (E) <br />STEM WALL SHOT PINS AT 12" <br />OC. INSTALL (2) LAYERS OF <br />BLDG PAPER BETWEEN STUD <br />AND STEM WALL. <br />PROD,-T 107 <br />