Laserfiche WebLink
Describe drainage flow paths (direction, location): <br />drainage will go west to east. <br />Are there Critical Areas? What are they and where are they located relative to your project?: <br />N/A <br />Task 2: Describe proposed project <br />Describe your proposed project: <br />proposed SFR <br />proposed DADU <br />How will your project change the existing condition?: <br />will require drainage system around the home to redirect water <br />Describe roofs, patios, driveways, or structures added: <br />Driveways surface flow to be <br />SFR with driveway headed towards 75th st se managed using BMP T5.12 <br />DADU with draveway headed towards cascade drive <br />How will stormwater be managed?: <br />gutters and downpipes into a sump -pump located outside directed to the street <br />window wells to sump -pump to be directed to the street Sump -pump will be directed <br />to a perforated stub -out <br />connection and connect to an <br />existing CB on Cascade Dr. <br />Describe how the project will affect existing drainage systems onsite or on adjacent properties <br />or both: <br />N/A <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 <br />