Laserfiche WebLink
• • <br /> on the first permit and now the second permit was applied for by your contractor,there can't be a revision of the first <br /> permit because now there are two different contractors. Either way the amount is the same. Each contractor or <br /> owner needs to pull their own permit. <br /> } <br /> Please review the valuation from the first permit and the second permit on the applications and make sure none of the <br /> work done in the first permit is included in the valuation for the second permit. If the valuation changes, I need you <br /> send that revision to me via email. <br /> Thank you, <br /> Cindy Bergsma <br /> Permit Technician I Permit Services <br /> 425.257.88101 3200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> Phone Hours:Monday-Friday : 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From: Ian Douglas<ian.c.douelas@gmail.corn> <br /> Sent: Monday,January 30, 2023 8:49 PM <br /> To: Cindy Bergsma<CBergsma@everettwa.gov> <br /> Cc:SMART Building Services LLC<Info@smartbuildingserviceslIc.com> <br /> Subject: Re:[EXTERNAL] Re: Plan Check Fee Due: Permit#B2212-025 at 1027 LOMBARD AVE <br /> Hi Cindy, <br /> 2 5 <br />