Laserfiche WebLink
0 0 <br /> r=� • <br /> Residential Photovoltaic OTC Permit Application <br /> IP <br /> ,err;ove ,_f. <br /> t7 N <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . . in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> »-----TO BE COMPLETED BY APPLICANT <br /> 0 Project Information ' <br /> Property Owner Name: JOHN DIVELY <br /> Project Address: 4301 TERRACE DR Parcel# <br /> City: EVERETT State: WA ZIP: 98203 <br /> Day Phone: 425-749-8945 <br /> Contractor Name SUNERGY SYSTEMS INC <br /> Contractor License#: SUNERSi905D4 <br /> Contractor Day Phone: 206-571-4726 <br /> PV system description ROOFTOP PHOTOVOLTAIC: <br /> (include manufacturer 14 SUNPOWER SPR-X22-370-WHT-AC MODULES. <br /> and model#1 of PV <br /> modules and . <br /> inverters): <br /> eDeierniine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that a 0 <br /> Is cede compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101,2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by !2. ❑ <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, rst. 0 <br /> metal roofing,lightweight masonry,or cedar shingles, <br /> 4. The installation shall comply with the manufacturer's instructions,[IRC M2302,2] N1 El <br /> 5. The Installation shall meet the requirements of NEPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority HavingJurisdiction to Iig El <br /> administer the electrical code.PC M2302.2] ' <br /> 6. The installation shall meet the requirements of the International Fire Code as amended .szi ❑ <br /> by WA State.[IRC M2302.2] <br /> 7. The PV system Is designed for the wind speed of the local area,and will be Installed per FA, p <br /> the manufacturer's specifications,[iRC M23012.1(1)] . <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302,2.1(2)1 Er ❑ <br /> 9, Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per•square foot.jiRC M2302,2.1(3)] g ' 0 <br /> Enter total dead load of system(lbs/ft2): 3. <br /> 10, To address uplift,modules are mounted no higher than 18"above the surface of the g 0 <br /> roofing to which they are affixed.[IRC M2302,2.1(4)] <br /> 1 - <br />