My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish Conservation District 2/14/2024
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish Conservation District 2/14/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 9:47:47 AM
Creation date
2/15/2024 9:47:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish Conservation District
Approval Date
2/14/2024
Council Approval Date
2/7/2024
End Date
6/30/2027
Department
Public Works
Department Project Manager
Apryl Hynes
Subject / Project Title
WDFW Regreen Everett Behavior Change campaign grant
Tracking Number
0004185
Total Compensation
$179,477.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
6 <br /> <br />the HSIL to distribute to the list serve of the upcoming presentation. The City will seek pre-approval <br />from the subaward manager for conference participation expenses proposed to be charged to this task. <br />The City and the District will also conduct at least annually a neighborhood education and outreach <br />workshop and submit any workshop materials developed (attendance sheet, factsheet, brochures, <br />postcards etc.). It is recommended that the subrecipients present after the Task 5 pilot is complete to <br />solicit feedback to incorporate into the Task 6 “relaunch”. <br /> <br /> <br />Deliverable <br />Number <br />Deliverable Target Completion Date <br />3.2a SSEC conference registration April 10, 2026 <br />3.2b SSEC submitted conference abstract or documentation of <br />“non-acceptance” <br />April 10, 2026 <br />3.2c If SSEC abstract accepted, copy of poster or presentation. July 10, 2026 <br />3.4a Conference abstracts and presentations April 10, 2027 <br />3.4b Workshop material developed October 10, 2025 <br />TOTAL ESTIMATED COST FOR TASK 3: $ 7,597 <br /> <br /> <br />TASK 4. Social Marketing Research & Survey Development <br />The City will perform formative social marketing research, a situational analysis, and audience surveys to <br />shape the development of the Regreen Everett behavior change campaign. A cross-sectional advisory <br />group of city staff, stakeholders, and partners will advise on the development of Task 4 to ensure equity <br />and inclusion. The District will be a part of the advisory group. <br /> <br />4.1 SOCIAL MARKETING RESEARCH <br />The social marketing research will identify property owners and local stakeholders to ascertain the <br />barriers, benefits, and motivators to planting and maintaining trees and other vegetation on their <br />properties to increase riparian buffer widths and functions. This research will inform the campaign’s <br />design elements. The City will convene a cross sectional advisory group of city staff and partners to <br />conduct a situational analysis, assessing the internal and external strengths, weaknesses, opportunities, <br />and threats. <br /> <br />4.2 SURVEY DEVELOPMENT <br />Utilizing the information collected in task 4.1, the City will develop, with input from the District, an <br />online survey to collect information from property owners as well as an in-depth stakeholder <br />questionnaire to collect key insights to identify and weigh areas of conflict, motivators, barriers (real or <br />perceived) to adopting said behavior.
The URL can be used to link to this page
Your browser does not support the video tag.