My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hultz BHU Engineers Inc. 2/15/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Hultz BHU Engineers Inc. 2/15/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 2:37:23 PM
Creation date
2/16/2024 9:11:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hultz BHU Engineers Inc.
Approval Date
2/15/2024
End Date
12/31/2024
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
RFQ - Everett Station HVAC controls replacement and maintenance
Tracking Number
0004188
Total Compensation
$194,090.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Hultz BHU Engineers, Inc. 11/26/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 4, 2024 <br />City of Everett, Facilities and Property Management <br />Everett HVAC Projects – Everett Station <br />Engineering Services Proposal Page 3 <br />Assumptions/Qualifiers 1. We assume that as-builts of the building and the mechanical and electrical systems are available, <br />and are reasonably accurate. We have included time for field reviews of the buildings but not <br />time to create as-builts of the existing systems. <br />2. Any past hazardous material surveys will be provided by the City. <br />3. Fire sprinkler and Fire alarm system work will be covered by a performance specification with <br />design by the installing contractor. <br />4. No utility locates are included in our scope. <br />5. Our work is limited to systems inside the building footprint. <br />6. We assume that the existing electrical service is adequate to support to project work. <br />7. No unusual or detrimental conditions exist at the area of work requiring any analysis or design <br />consideration by us (e.g. existing code violations, power quality issues, existing failed <br />components, etc.). <br />8. Permit fees are not included. Note that the efforts to respond to resolve permit comments are <br />included in this proposal. <br />9. Commissioning specifications are for code required commissioning (done by a firm independent <br />of the installing HVAC/Controls contractor). Additional levels of project commissioning may be <br />provided at the City’s request. <br />10. We will provide you AutoCAD as-builts (based on contractor mark-ups) at the completion of theproject.11. If there are city facility design standards we are to adhere to, we will be provided those in writing <br />prior to us starting our design. <br />12. We assume that you will review our progress submittals and final design documents to confirm <br />their design intent is being met. <br />13. No construction will begin or ordering of materials will begin until all permits have been obtained <br />and permit comments resolved. <br />14. Project will not be bid until all permit comments have been resolved. <br />15. Support of a formal Value Engineering process is not included. <br />16. LEED and related processes are not included. <br />17. A calculation to evaluate compliance with the State Clean Building Performance Standard (CBPS) <br />is included in the basic services. However, if a building does not comply with the CBPS , the <br />efforts to identify and design these additional measures needed to comply are not included. <br />These efforts, including Energy Modelling for the CBPS, are not included but can be provided if <br />needed as an added service. <br />We appreciate this opportunity to work with you; Let us know if you have any questions. <br />Sincerely, <br />Hultz|BHU Engineers Inc. Michael Tagles, PE <br />Associate Principal <br />Attachments: Hourly Rates, 1 page
The URL can be used to link to this page
Your browser does not support the video tag.