Laserfiche WebLink
• • <br /> 'Drew Martin <br /> From: Drew Martin <br /> Sent: Tuesday, December 7, 2021 9:32 AM <br /> To: tauriol@comcast.net <br /> Subject: City of Everett Permit Services: 6902 Columbia Avenue (B2110-057) -First Building Intake <br /> Review <br /> Attachments: 2018 IRC_Typical Code References_04-12-2021.docx; CoE_Residential Drawing <br /> Preparation_Edited 09-27-2021.pdf <br /> Hello, Tyler. <br /> Your application has been received and a permit set up. However, the submitted documents are not <br /> sufficiently developed for us to perform a comprehensive review at this time. <br /> Information is attached to provide guidance. Construction-level documents should be submitted for <br /> review. Two complete sets of the revised drawings should be submitted to replace the previously submitted <br /> drawing sets. Preliminary comments are provided below to assist in preparing the drawings, but these are not <br /> intended to provide a comprehensive review. The resubmittal documents should include an itemized <br /> response letter clarifying how the review comments below have been addressed. Depending on your <br /> experience with the adopted codes and preparing documents, we recommend consulting with a design <br /> professional to assist you. <br /> Intake Review Comments: <br /> General: <br /> 1. The submitted documents include sketches for the proposed project. Construction-level drawings <br /> prepared using established drafting standards are required to substantiate compliance with the IRC. The <br /> drawings should be prepared using a standard scale (e.g, 1/4"=1'-0") and be printed on a paper size <br /> consistent with the drawing scale(s). The drawings should include plans, building sections, details, <br /> material specifications, design loads, architectural and structural notes, etc. as needed to clearly show the <br /> proposed work. See IRC Section R106.1.1. <br /> 2. The construction drawings should include the entire house. Detailed construction information is not <br /> required for areas that are not included in the proposed scope-of-work. At a minimum,the plans should <br /> show the walls, doors, egress routes,windows including egress windows, smoke and CO alarms, and use of <br /> each room. See IRC Section R106.1.1. <br /> 3. The project should specify the applicable building codes, including but not limited to the 2018 IRC, 2018 <br /> WSEC, and the 2018 IBC. See Section R106.1.1 and EMC Section 16.005.030. <br /> 4. The project should specify the correct address on each sheet of the construction drawings. The address is <br /> 6902 Columbia Court per the City of Everett records. Note that addresses are established by the City of <br /> Everett, not Snohomish County. See IRC Section R106.1.1. <br /> ' 3 <br />