My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6500 MERRILL CREEK PKY BASE FILE 2024-03-01
>
Address Records
>
MERRILL CREEK PKY
>
6500
>
BASE FILE
>
6500 MERRILL CREEK PKY BASE FILE 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 10:43:21 AM
Creation date
2/18/2024 9:44:15 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6500
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Fire Alarm System <br /> EVERETT EVERETT Acceptance Test Checklist <br /> WASHINGTON INFORMATION HANDOUT C-5 4.13.2020 <br /> General <br /> This document's intent is to provide contractors with guidelines outlining the expectations and <br /> procedures for how the Everett Fire Marshal's Office will conduct an acceptance test of a fire alarm <br /> system.This document addresses the most common aspects of a fire alarm acceptance tests, in cases <br /> where this document does not address a device or operation used with your system the IFC, NFPA, <br /> and/or Manufacturer Specifications will be used to determine testing criteria. <br /> Step 1 : Preparation PASS FAIL N/A <br /> 1. Schedule Inspection -The contractor shall schedule for the inspection using ❑ ❑ ❑ <br /> eTRAKiT online permitting portal. Inspection requests submitted online before <br /> 11:59 p.m. on Monday-Friday will be tentatively scheduled for the next business <br /> day. IMPORTANT—the Fire Alarm System cannot be finalized until the associated <br /> electrical permit has be finalized by the building department. <br /> 2.. Approved Plans-Approved/Stamped set of plans showing how system was ❑ ❑ ❑ <br /> installed. <br /> 3. Cut Sheets- Manufacturer cut sheets indicating the proper method of testing for ❑ ❑ ❑ <br /> smoke and heat detectors. <br /> 4. Pretest- Printout of pretest showing all devices have been tested and how each ❑ ❑ ❑ <br /> device annunciates at the FACP. <br /> 5. NFPA 72 Report- NFPA 72 Record of Completion (not req'd for flow/tamper ❑ ❑ ❑ <br /> systems). <br /> 6. 24 hour Battery Test-At the time of the inspection/test provide proof verifying ❑ ❑ ❑ <br /> that the panel has been operating on secondary power(battery)for 24 hours. No <br /> other problems shall be indicated on the panel. <br /> Tools Equipment and Personnel: <br /> PASS FAIL N/A <br /> 7. Staffing-A minimum of two fire alarm contractors with 2 two-way radios. ❑ ❑ ❑ <br /> 8. Contractors-The following contractors may need to be present during the ❑ ❑ ❑ <br /> acceptance test depending on the systems provided in the building: sprinkler <br /> contractor, mechanical contractor, elevator contractor, general contractor, special <br /> suppression system contractor. <br /> 9. Ladder-A ladder shall be provided to gain access to devices for testing. ❑ ❑ ❑ <br /> Fire Marshal's Office 1 425.257.8100 1 everettwa.gov/fire <br />
The URL can be used to link to this page
Your browser does not support the video tag.