Laserfiche WebLink
THE 0...S. <br /> 00.0U. <br /> 2018 WASHINGTON STATE ENERGY CODE NOTES 2018 WASHINGTON STATE MECHANICAL CODE (IMC AMENDMENTS)NOTES � � <br /> 1. ALL EQUIPMENT SHALL BE PROVIDED WITH PERMANENT FACTORY APPUED NAMEPLATES PER SECTION 301.9.REFER TO SPECIFICATIONS FOR PROJECT SPECAIC LABELING REQUIREMENTS <br /> TABLE C403.10.1.2-SUPPLY,RETURN AND RELIEF AIR DUCTWORK INSULATION <br /> 1, PROVIDE RECORD DOCUMENTS IN ACCORDANCE WITH SECTION E103.6.1.PROVIDE OPERATION AND MAINTENANCE MANUALS W ACCORDANCE WITi <br /> SECTION C016.2 PROVIDE THE OWNER DM THE CWPUWNCE DOCUMENTS REQUIRED BY SECTION C103.6.3.REFER ALSO TO THE PROJECT 2 ALL EQUIPMENT SHALL COMPLY WITH WE REQUIREMENTS OF SECTION 30 MEN INSTALLED IN A LOCATION NOT AS SHOWN ON THE DESIGN PLANS <br /> DUCT SYSTEM DUCT LOCUM AND USE CLIMATE ZONE R-VALUE <br /> SPECIFICATIONS FOR ALL CLOSEOUT AND RECORD DOCUMENT REQUIREMENTS THE DRAWINGS SHALL INDICATE,AT A MINIMUM.THE LOCATOR AND <br /> PERFORMANCE DATA OF EQUIPMENT,AS-WILT CONFIGURATION OF DUCTWORK AND PIPING DISTRIBUTION SYSTEMS,INCLUDING FLOW RATE, 3. ALL PIPING SHALL BE SUPPORTED PER TABOR 305.4. <br /> SUPPLY NR OR OUTSIDE THE BURRING(OUTDOORS AND EXPOSED TO WEATHER) 4C R-8 <br /> EQUIPMENT TAGS,AND FlELO VERIFTED DIMENSIONS. RETURN NR <br /> TABLE 305.4-PROM SUPPORT SPACING. <br /> 2. PROVIDE OWNER TRAINING PER SECTION C103,6.4 AND AS REWIRED BY THE PROJECT SPEIFICATON TUNING OWNER T ING MUST TAKE PLACE BEFORE SUPPLY AIR OR OUTSIDE THE BUILDING(OUTDOORS AND EXPOSED TO WEATHER) SB R-12 <br /> RETURN AR PIPING MATERIAL MANMUM HORIZONTAL SPACING(Fr) MAMLUM VERTICAL SPACING(FT) <br /> OWNER OCCUPANCY BUT CAN TAKE PLACE AFTER SUBSTANTIAL COLIPLEOON HAS BEEN APPROVED. <br /> SUPPLY AR OR UNCONDITIONED SPACE(ENCLOSED BUT NOT IN THE BUILDING ABS PIPE 4 10` <br /> 3. SEAL,GASKET,OR WEATHER STRIP ALL ACCESS DOORS AND PANELS THAT MEN FROM CONOTONED SPACES TO UNCONDITIONED SPACES AND PER RETURN AR CONDITIONED ENVELOPE) 4C AND 58 R-6 <br /> SECTION C902S4. AWLBBUIM PIPE AND TUBING 10 15 <br /> UNCONDITIONED SPACE YAIERE THE DUCT EERINESS NR THAT IS MTNN <br /> SUPPLY AR OR 15F 6 THE AN TEMPERATURE ON THE SIIRRWNOWC UNCONDITIONED 4C AND SB R-3.3 CAST NON PPE^ 5 15 <br /> 4, PROVIDE VARIABLE SPEED DRIVES FOR ALL FAN MR/PUMP MOTORS GREATER THAN OR EQUAL TO 7.5 HP PER SECTION C103.23, RETURN AR SPACE <br /> COPPER OR COPPER-ALLAY PIPE 12 10 <br /> 5. HVAC EWPMENT SHALL HAVE MINIMUM PERFORMANCE AT SPECIFIED RATING CONDEMNS NOT LESS THAN THE VALUES INDICATED IN TABLE SUPPLY NR OR <br /> C4013.2(I)A THROUGH C403.12(12)OF THE WASHINGTON STATE ENERGY CODE AND AS INDICATED ON THE CONTRACT DOCUMENTS RETURN MR WHERE LOCATED N A BUILDING ENVELOPE ASSEMBLY 4C AND$B R-16 COPPER OR COPPER-ALLOY TUBING 8 ID <br /> YAM CONDITIONED SPACE WHERE THE SUPPLY DUCT CONVEYS AR CPVC PIPE OR TUBING 1 OUCH AND SMALLER 3 104 <br /> 6. MECHANICAL SYSTEM EQUIPMENT SIZING COMPLIES NM ENERGY CODE COPUANCE UNITS SECTION C403.3.1. SUPPLY AIR THAT IS LESS THAN SSF OR GREATER THAN 105E ANDS R-3.3 <br /> OPEC PIPE OR TUBING 1 1/4 INCHES AND LARGER 4 104 <br /> 7. PROVIDE EACH ZONE WIN THERMOSTATIC CONTROLS PER SECTOR C403,4,AS REWIRED BY TIE PLANS,SPECIFICATIONS.AND TO WLFlLL THE MTAN CONDITIONED SPACE THAT THE DUCT DIRECTLY SERVES WHERE LEAD PIPE CONTINUOUS 4 <br /> SEQUENCE OF OPERATONS T SUPPLY AR THE SUPPLY DUCT CONVEYS AIR THAT IS LESS THAN 557 OR GREATER 4C AND 58 NONE <br /> THAN 1057 <br /> PR PIPE OR TUBING 2-2/3(32 INCHES) 4 <br /> U PROVIDE DEAD BAND BETWEEN HEATING/COOING SPACE SENSOR SETPOINTS OF 5 DEGREES AS REQUIRED BY SECTION C403.4.1.2 OR AS DESCRIBED SUPPLY AR WITI6N CONOTONED SPACE WHFAE TiE SUPPLY DUCT CONVEYS AIR AND NONE <br /> IN THE TEMPERATURE CONIRoL SEQUENCES PROVIDE MIT SWITCHES PER SECTON C403.4.1.3,PROVIDE OFF HOUR CONTROLS(SETBACK.AUTOMATE <br /> THAT IS SSF OR GREATER AND IOSF OR LESS PE-RT 1 INCH AND SMALLER 2-2/}(32 OUCHES) 10` <br /> START/STOP,OFF HOUR SCNEDONG,ETC.)PER SECTION C4014.2 RETURN OR PATIN CONDITIONED SPACE,DOWNSTREAM OF AN ENERGY RECOVERY R-W PE-RT 1 1/4 MORES AND LARGER 4 10` <br /> EXHAUST AIR MEDIA,UPSTREAM OF AN AUTOMATIC SHUTOFF DAMPER <br /> 9. SIMULTANEOUS HEATNG AND C000NG TO NDIVIDUAL ZONES SHALL BE PROHIBITED AS DESO6BEO IN THE TEMPERATURE CONTROL SEQUENCES PIX TUBING 1 INCH AND SMALLER 2-2/3(32 INCHES) 10` <br /> ` EXCEPT AS PERMITTED BY TIE WASHINGTON STATE ENERGY CODE AND APPROVED BY THE WILDING OFFICIAL RETURN OR WITHIN CONDITIONED SPACE,DOWNSTREAM OF AN ENERGY RECOVERY SB R-12 4 INCHES AND LARGER 4 1O <br /> EXUAUST AIR MEDIA UPSTREAM OF AN AUTOMATIC SHUTOFF DAMPER PIX TUBING 1 1/ <br /> ICI PROVIDE RELAYS AND CONTROLS CAPABLE OF DISABLING THE HEATING/COOING.OR RESETTING THE ZONE TEMPERATURES,PER SECTION C403.4.1.6 RETURN OR CONDITIONED SPACE AND DOWNSTREAM OF AN AUTOMATIC SHUTOFF POLYPROPYLENE(PP)PIPE OR TUBING.1 NCH AND SMALLER 2-2/3(32 INCHES) iO <br /> WHERE AN OPERABLE DOOR OPEN FROM A CONDITIONED SPACE TO THE OUTDOORS EXHAUST AIR DAMPER 4C AND 58 R-16 <br /> POLYPROPYLENE(PP)PIPE OR TIME,1 1/4 INCHES AND LARGER 4 10` <br /> 11.THE HVAC SYSTEM AND ITS CONTROLS SNAIL ALLOW ECONOMIZER OPERATION AS THE FIRST STAGE OF COOING WHENEVER MECHANICAL COOING IS NOTE REFER TO 21118 WSEC FOR TABLE FOOTNOTES. PVC PIPE 4 IV <br /> REQUIRED.MO AND WATER ECONOMIZERS SHALL BE CAPABLE OF PROVIDING PARTAL COOING EVEN WHEN ADDITIONAL MECHANICAL COOING IS <br /> REWIRED TO MEET THE REMAINDER OF THE COOUNG LOAD.REFER TO CONTROL SEQUENCES FOR MORE WFORMATIOL STEEL TUBING B 10 <br /> 14.ALL DUCTWORK SHALL COMPLY WITH SMACNA STANDARDS FOR CONSTRUCTION OF GALVANIZED DUCTWORK.ALL DUCTWORK SHALL BE SEALED AS STEEL PIPE 12 15 Silver Lake Elementary <br /> 12 INSULATE PIPE PER THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS AND PER SECTION C40110.3 AND PER TABLE C403.10.3. REWIRED BY SECTION C403.10.2 DUCT TAPE NOT ALLOYED. <br /> TABLE FOOTNOTES - Boiler Replacement <br /> TABLE C401.10.3-MINMUM PIPE INSULATION TCCKNFSS(INCHES) 15.DUCTWORK STATIC PRESSURE CLASSES D.SEE SECTION 301.18. <br /> &THE MAXIMUM HORIZONTAL SPACING OF CAST IRON PIPE HANGERS SHALL BE NCREASEO TO 10 FT.WHERE 10-FOOT LENGTHS OF PIPE ARE INSTALLED. <br /> FLI.ID OPERATING INSULAIKN COIIOUCTMIY _ NWGNAL PIPE OR TUBE SIZE.(NCAES) c_ _ _ _ _ _. __ _ address: <br /> _ DUCTWORK PRESSURE CLASSES NID-STORY GUIDE... <br /> TEMPERATURE12815 Bothell-Everett Highway <br /> RANGE AND USAGE CNNWCTMTY MEAN RATING 1'TO< 1-1/2"TO PRESSURE CLASS WATER COWAN OF ASSOCIATED EDUPB ENT <br /> (Ti) BM x IN/(H x FO'x F) TDIEIRATURE,F '' 1-1/2' <4• 4'TO vY ffi 4. PROVIDE EQUIPMENT WIN SERVICE AND INSTALLATION CLEARANCES PER MANUFACTURER'S WRITTEN INSiRUCTO7S ALL EQUIPMENT SHALL BE INSTALLED WITH A LEVEL WORKING SPACE Everett,WA 98208-6630 <br /> 'LOW PRESSURE' UP TO 2 INCHES NOT LESS THAN 30 INCH BY 30 INCH ON THE MAINTENANCE SIDE OF TIE EQUIPMENT PER SECTION 306.1 WHERE SMALLER AREAS ARE NOTED BY THE MANUFACTURER'S GUIDES <br /> >350 0.32-0.34 250 4.5 5.0 5.0 5.D 5.0 <br /> 251-350 0.29-0.32 200 3.0 4.0 4.5 4.5 4.5 "MEDIUM PRESSURE' GREATER THAN 2 INCHES TO LESS THAN 3 INCHES 5, ROUTE ALL CONDENSATE PIPING PER PLAN AND AT SIZE SHOWN ON PLAN.WHERE NOT SHOWN ON PLAN,CONDENSATE SHALL BE ROUTED TO THE NEAREST FIXTURE TAILPIECE AND <br /> 211-250 0.27-0.30 150 2.5 25 25 3.0 10 HIGH PRESSURE' }INCHES AND ABOVE SHALL BE SIZED PER TABLE 307.22 WHERE OVERFLOW OF THE PRIMARY CONDENSATE MAY CAUSE DAMAGE TO BUILDING COMPONENTS,PROVIDE AN AUXIUARY AND SECONDARY ORMN <br /> 141-20 0.25-029 125 1.5 1.5 20 20 20 SYSTEM PER SECTION 307.21 <br /> 105-140 D.21-0.28 100 1.0 1.0 1.5 1.5 1.5 16.PROVIDE BALANCING DEVICES IN ALL BRANCH DUCTS AND PIPE RUNS TO TERMINAL DEVICES AS REQUIRED BY SECTION C408.221 AND C408222 <br /> 40-60 0.21-027 75 05 0.5 1.0 1.0 1.0 AND AS INDICATED ON THE CONTRACT DOCUMENTS PROVIDE ALL BALANCING DEVICES NEEDED TO ADJUST EQUIPMENT TO THE DESIGN FLOW VALUES TABLE 307.22-CONDENSATE DRAIN SIZING <br /> <40 0.20-0.26 75 0.5 1.0 1.0 1.0 1.5 INDICATED ON THE PLANS AND SCHEDULES. EQUIPMENT CAPACITY MMNIMIIAI CONDENSATE PIPE DIAMETER <br /> NOTE REFER TO 2018 WSW FOR TABLE FOOTNOTES <br /> 17.PROVIDE ISOLATOR VALVES FOR ALL EQUIPMENT CONNECTED TO FLUID PIPING. UP TO 20 TONS OF REFRIGERATION 3/4 INCH <br /> 13.INSULATE ALL DUCT WORK PER THE REOUIREAIENTS OF THE PLANS AND SPECIFICATIONS AND PER SECTOR C403.10.1 AND <br /> PER TABLE C403.10.1.1 AND C403.10.1.2. I&HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION C40822 CONTRACTOR SHALL HIRE A BALANCE SPECIAUST AND PROVIDE OVER 20 TONS TO 40 TONS OF REFRIGERATION 1 NCH <br /> RESOURCES TO SUPPORT THE REWIRED BALANCING ACTMTES.REFER TO TIE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS OVER 40 TONS TO 90 TONS OF REFRIGERATION 1-1/4 NCH <br /> TABLE C403.10.1.1-OUTDOOR AIR DUCTWORK INSULATION <br /> 19.CONTRACTOR SHALL PROVIDE COMMISSIONING AND REPORT OF COMMISSIONING SHALL BE SUBMITTED TO THE OWNER AS REQUIRED BY SECTION C400. OVER 90 TONS TO 125 TONS CF REFRIGERATION 1-1/2 NCH <br /> WMAIE MINMUM INSTAIIED COMMISSIONING SHALL CONSIST OF A COMMISSIONING PLAN,BALANCING,FUNCTIONAL PERFORMANCE TESTING,POST CONSTRUCTION COMMISSIONING. <br /> DUCT SYSIEN DUCT LOCATION AND USE ZONE AIRFLOW DUCT INSULATION OVER REPORTS AND ACCEPTANCE.SUBMIT COMMISSIONING COMPLIANCE CHECKLIST TO BUILDNG OFFICIAL UPON COMPLETION.REFER TO THE OVER 1251ONS TO 250 TENS GE REFRIGERATION 2 INCH <br /> R-VALUE <br /> SPECIFlCATONS FOR ADDITIONAL REQUIREMENTS. <br /> INSIDE COEITONED SPACE AND UPSTREAM OF AUTOMATIC <br /> OUl00Ot AR 4C AND SB 22ED0 CFM R-16 6, PROVIDE AU.CONDENSATE ONES WITH TRAPS PER SECTION 307.24.DUCTLESS SPOT SYSTEMS SHALL BE PROVIDED YOH AN INUNE CHECK VALVE PER SECTION 307.2.4.1.CONSULT THE <br /> SLOJ OFF DAMPER DO.PROVIDE CLASS I MOTORIZED SHUTOFF DAMPERS AT ALL LOCATIONS REQUIRED BY SECTION C40.7.8.1. MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATION OF TRAPS ON EQUIPMENT CONDENSATE DRAINS <br /> design phase: <br /> WIDOOR AIR AUTOMATIC SHUTOFF PAMPER D DONII UNITMOR ROOM 4C 22800 CFM R-8 21,DAMPERS SHALL COMPLY 111TH SECTION C403.7.83,INCLUDING DAMPERS INTEGRAL TO HVAC EQUIPMENT,AND SHALL HAVE A MAXIMUM LEAKAGE <br /> 7. MAINTAIN CLEARANCE TO/FROM OUTSIDE AIR INTAKES PER SECTION 401.4. SET PERMIT <br /> RATE WHEN TESTED IN ACCORDANCE WITH AMCA STANDARD SCO OFD (AT 1.0 INCH WC.). <br /> INSIDE CONDITIONED SPACE AND DOWNSTREAM OF <br /> ?28 W1000R AN 56 00 CPA R-ID MOTORIZED DAMPERS 4 CM/R2 OF DAMPER AREA. B. MAINTAIN CLEARANCE TO/FROM EXHAUST AIROPENINGS PER SECTION 501.3.1,AUTOMATIC SHUTOFF DAMPER TO HVAC UNIT OR ROOM <br /> NON-MOTORIZED DAMPERS 20 CFM/FM OF DAMPER AREA <br /> OU1DOR AIR INSIDE CONDITIONED SPACE 4C AND 56 <2800 CFM R-7 NON-UOTORIOED DAMPERS SMALLER THAN 24 INCHES IN EITHER DIMENSION:40 CFM/FT2 OF DAMPER AREA. 9. ALL EQUIPMENT LOCATED IN PLENUMS SHALL BE RATED FOR USE IN PLENUMS. <br /> NOTE REFER 10 2018 NEC FOR TABLE FOOTNOTES 22 ALL DUCT SYSTEMS SHALL BE SEALED TO A LEAKAGE RATE NOT TO EXCEED 4 PERCENT OF TIE FAN FLOW IF 7HE DUCT SYSTEM:IS CONNECTED ....................... <br /> TO A HIGH-PRESSURE OR MEDIUM-PRESSURE PIECE OF AR MOVING EQUIPMENT;OR HAS ANY DUCT SURFACE AREA LOCATED IN ANY revisions: <br /> UNCONDITIONED SPACE.TIE LEAKAGE RATE SHALL BE CONFIRMED THROUGH FIELD VERIFICATION AND DIAGNOSTIC TESTING,IN ACCORDANCE MATT <br /> SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL no. description date <br /> .152 <br /> 3r�1 <br /> design by: R L/A V <br /> ri$'Y OF EVERETT drawn by: J A/J Z <br /> Itia REVIEWED FOR PERMIT d 11/15/2022 <br /> Job no.: 2022.125 <br /> sheet title: <br /> WA CODE NOTES <br /> I approvals: sheet number <br /> MO.2 <br />