My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2022 Plans 2024-02-20
>
Address Records
>
19TH AVE SE
>
12815
>
Plans
>
12815 19TH AVE SE 2022 Plans 2024-02-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 11:17:01 AM
Creation date
2/20/2024 11:16:49 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Permit
M2212-052
Year
2022
Notes
GWH & BOILER REPLACEMENT IN UNDERGROUND MECHANICAL ROOM
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TUEGREENDO<I1 CeoUP.C. <br /> ))) <br /> MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE I �� <br /> SEQUENCE OF OPERATIONS: MARK DESCRIPTION SERVES BASK OF DESIGN NOTES <br /> AS-I MR SEPARATOR PRIMARY CIRC LOOP BRA CRS-3F 1 <br /> DOSING AU.EOTON BACTAIK DOC SEEM SHALL BE CONNECTED TO NEW BOILERS BOILER PUMPS MO CIROULATON PUMPS WITH FULL SYSTEM PEER TO PEER - SF-1 SHOT FEEDER PRIMARY CIRC LOOP 5 GAL 2 <br /> BACNET INTEROPFRABOJTY.DOC SYSTEM REASONS SHALL B INSTALLED BY ATS CONTACT DAN ALERT. MF-1 BOILER MAGNETIC FILTER PRIMARY CIRC LOOP %i-3 3 <br /> EXISTING AUERTFI IBEX SYSTEM CONTROLS THE TERMINAL UNITS THREE WAY VALVES IN TERMINAL UNITS SHALL BE REPLACED WITH NEW 2-WAY VALVES; RPBFP REDUCED PRESSURE BACKROLI PREVENTOR SYSTEM MAKE-UP WATTS 009-1' 4 <br /> PR0N0ED BY ATE,INSTALLED BY NC - NOTES: <br /> I.COALESCING AIR SEPARATOR WITH STRAINER AND BLOW DOWN.PROVIDE WATH HIGH CAPACITY AIR VENT. <br /> HYDRONIC HEATING SYSTEM: 2.GTP-DES. <br /> 3.BOILER MAC KT BY ECLIPSE MAGNETICS <br /> MAN UROLJ A710N PUMPS P-1 AND P-T PUMPS P-1 AND P-2 ARE REDUNDANT AND ARE MODULATED BY WOO PUMPS P-1 AND P-2 SHALL BE STAGED AS 4.PROVIDE 1/4 TURN BALL VALVES ON INLET AND OUTLET. <br /> LEAD/STANDBY.TIE LEAD P W DESIGNATION SHALL BE ROTATED BROLLY BY THE DOC <br /> OVA CALL FOR HEAT,LEAD MAN CIRCULATOR PULP(P-1 Ot P-2)SHALL BE ENERdZED.LEAD PUMP KO SHALL MODULATE PUMP SPEED TO MAINTAIN A <br /> DISCHARGE PRESSURE OF 13 PS(ADJUSTABLE), MOTORIINVERTOR SCHEDULE <br /> MARK SERVES LOCATION H.P. VOLTS PHASE BASE OF DESIGN NOTES <br /> MAN CIRCULATOR RAP ROILS SHALL BE NCNTOREO BY DIFFERENTIAL PRESSURE ACROSS EACH PUMP.IF DIFFERENTIAL PRFtgAF ROTATES LESS OF ROW,THE VFD-1 PUMP P-1 BOILER ROOM 5 208 3 ABB 1 <br /> LEAD PUMP SHALL BO DE-ENROZED AND THE STANDBY RAP SHALL BE ENERGIZED AND COG STALL BE AL.LRLED. VFD-2 PUMP P-2 BOILER ROOM 5 208 3 ABB 1 <br /> NOTES <br /> UPON FAILURE OF THE LEAD PULP WO,THE LEAD PUMP SHALL BE DE-ENERGIZED AND THE STANDBY PULP SHALL BEEFRGE UPO <br /> N ON FAILURE OF THE 1.PROVERE N11H ELECTRONIC BYPASS.MODEL ACH5813-UDR-024A-2 <br /> STANDBY DRIP LED.THE DOC SYSTEM SHALL SIGNAL SEEDED STANDBY PULP TO OPERATE W BYPASS LODE AND THE DOC SYSTEM SHALL SET AN ALARM. <br /> PUMP SCHEDULE <br /> BORERS 13-1 AND B-T MOTOR DATA SUCTION DIFF TRIPLE DUTY VALVE <br /> BOORS ARE REDUNDANT AND STAGED AS LEAD/STANDBY.THE LEAD BOILER DESIGNATION SHALL BE ROTATED NEEKLY.(ADJUSTABLE) MARK SERVES PUMP TYPE GPM PUMP HEAD(FT WG) MIN EFF(%) HP V/PH FLA RPM (TM) SZE(IN) BASS OF DESIGN NOTES <br /> P-1 MAIN CIRC LOOP END SUCT 125 60 50 5.0 208/3 16.7 1800 YES 3' ARC E-1510-2B0 1.23 <br /> ON A CALL FOR HEAT,LEAD BOILER AND DESIGNATED BOILER PUMP SHALL BE ENERGIZED.LEAD BORER SHALL OPERATE AT FULL FIRING RATE UNTIL HEATING <br /> LOOP TEMP RESE <br /> T RE MATCHES BOILER SCHEDULE TEMPERATURE I LEAD BOILER CANNOT MEET BOOR RESET SCHEDULE LEAD BOILER SHALL BE P-2 MAIN CIRC LOOP DID SECT 125 60 50 5.0 208/3 16.7 MO ES 3' BAG E-1510-28D 1,23 <br /> DE-ENERGIZED ANT STANDBY BOILER SHALL BE ENERGIZED.SELECTED BOILER SHALLMODULATE FIRING RATE AND ROUT RATE TO MAINTAIN RESET SCHEDULE BP-1 BOILER PUMP IN-LINE 96 10 55 7 208/1 3.5 VAR ND NO BUG ECOCIRC%L-45-200 4 <br /> (ADJUSTABLE) BP-2 BOILERPUMP N-ONE 96 10 55 1 208/1 3.5 VAR NO NO BUG ECOCDC XL-40-200 4 <br /> NOTES <br /> ADJUST 1.INSTALL PUMP ON INERTIAL BASE.MASON BMK-V-18'x42'.PROVIDE WITH LBMC-6-B CORNER BRACKETS AND(4)C-A-310 HOUSED SPRING MOUNTS,1'DEFLECTION <br /> RESET SCHEDULE SHALL BE BASED ON OUTSIDE AIR TEMPERATURE AT 60 DEGREES OAT(ADJUSTABLE)SUPPLY WATER TEMPERATURE SHALL BE 120 DEGREES 2.CONNECT PUMP TO M.SEE INVERTER SCHEDULE <br /> (ADJUSTABLE).BELOW 60 DEGREES OAT,THE SUPPLY WATER TERATURE SHALL INCREASE YIN TEMPERATURE DECREASE.AT 40 DEGREES OAT(ADJUSTABLE), 3.PUMPS P-1 AND P-2 ARE REDUNDANT.AND SHALL OPERATED AS LEAD/STANDBY. <br /> ELP <br /> 4.CONNECT TO INLET OF NEW BORER IN BOILER ROOM. <br /> TIE SUPPLY WATER TEMPERATURE SHALL BE THE MAMMON TEMPERATURE OF 180 DEGREES(ADJUSTABLE). <br /> - SHUTDOWN:BOTH BORERS SHALL AUTOMATICALLY SHUT OF NEN ETHER EMERGENCY POWER OF(EPO)K PRESSED OR THE CO DETECTOR K N ALARM.THE HOT WATER BOILER SCHEDULE <br /> DOC SHALL NEDEOR AUXILIARY CONTACTS FOR PRONGING STATUS EPO SHALL BE OARED DIRECTLY TO BOILER CONTROL PANEL,OATH MOMTCFMM BY DOC PRESSURE 1' y� <br /> MARK BOILER NJPU7 WATER FIRING RATE RATING VENT CORN ELECTRICAL DATA BASS OF DESIGN Silver Lake Elementary <br /> BORER PAPS BP-1 AM RP-2. OUTPUT(MBH) GPM(20DIF) LW.T. DEG.F GAS(CAN) INLET PRESSURE (PSG) DIA. INCHES MCA V. PH. MANUFACTURER/MODEL/ Boiler Replacement <br /> BOILER PULPS ARE MAPPED WTI INTEGRAL SPEED CONNOS EACH BORER PAP SHALL BE MODULATED BY ITS ASSCaATED BOILER'S INERTIAL CONTROLS,TO B-1 1,250 1,203 120 180 1250 TO WC 160 8' 9.0 120 1 LCCHINVAR CREST FBN-1251 <br /> MODULATE BASED ON BORER FIRING RATE BOILER PUMP FNWRE SHALL BE MOBTRED AND ALARMED BY ASSOCIATE)BORER ON-BOARD CONTROL EVERETT B-2 1.250 1.203 120 180 125D 12'NC 160 8' 9.0 120 1 LOCHINVAR CREST FBN-1251 <br /> -PUBLIC SCHOOLS OPERATORS S ALL DETERMINE THE.DATE THAT THE:BORER SYSTEM.K STARTED AM STOPPED FOIL THE SEASON. - - - -.. NOTES address:1.10'DIRECT _. <br /> 2 75 PS REEVE VVALvV,a2. AIR. 12815 Bothell-Everett Highway <br /> FASTING.GIMP PUMP 3.BORER VOLUME 157 GALLONS {F <br /> DIOIWG SUMP PUMP LOCATED IN THE SOUTH NEST CORNER OF THE BORER ROOM SHALL BE MONITORED BY TIE DOC SYSTEM MEN SUMP PUMP IS STARTED BY 4.BOLT BOILERS TO EXISTING CONCRETE PAD. • <br /> Everett,WA 98208-6630 <br /> E%15IWC CONTROL PAN],DOC SHALL BE SIGNALED THAT THE PIMP IS OPERATING. <br /> PROVIDE WITH ALARM,EMS GATEWAY AND CONDENSATE NEUTRALIZER KIT. <br /> PUMP RUN NSTCRY SHALL BE LOGGED BY THE DOC SYSTEM. <br /> 1 EXISTING BLADDER COMPRESSION TANK SCHEDULE <br /> IF A HIGH WATER ALARM IS MATED BY THE EKSTM PIMP CONTROL PANE,1TE ODC SYSTEM SHALL SET AN ALARM,END OF SEQUENCE OF OPRATOIS TEMP.RANGE(OEG.R) PRESS.RANGE(PSG) BLADDER PRESS TANK VOLUME ACCEPTANCE <br /> MARK SYSTEM SERVED SYSTEM VOLUME(GAL) BASS OF DESIGN NOTES <br /> MAX. MIN. MAX MIN. (PSG) (GAL) VOLUME(GAL.) <br /> (E)BT-1 HTG LOOP 955 185 50 50 15 15 80 80 AMTROL EXTROL 300E 1 <br /> NOTES <br /> I.EXISTING TO REMAIN.CONTRACTOR TO REPLACE EXISTING BUDDER WITH NEW BLADDER FROM ORIGINAL MANUFACTURER. <br /> EXISTING HYDRONIC EQUIPMENT SCHEDULE POINTS LIST SCHEDULE <br /> AIR HEATING HOT WATER COIL DATA FMCS OUTPUT EMCS INPUT <br /> SYSTEM DESCRIPTION RIGS ALARM EMCS APPLICATION FUNCTION REMARKS <br /> MARK HEATING REMARKS DIGITAL ANALOG DIGITAL ANALOG <br /> / <br /> SUPPLY FAN OUTSIDE C AIR OUTPUT DESIGN WATER I a <br /> CPU MIN.CRA (MBH) GPN TEMP.DELTA u w w gg P- <br /> BOU-1 1,375 550 60.5 6.10 20 1 '- y rc o <br /> BCU-2 1375 550 60.5 6.10 20 1 a rc rc as g R a ' Fsi P o 5 w i - F 5 W w - rc z o w § g z <br /> EQUIPMENT POINT OESRIPTGN c o U z . w '' F g rc a 3 z u 5 w o U g a o f w <br /> BCU-3 11D0 440 48.4 4.BD 20 2 - o !9 < w p, i, < > IX j_ 5E o z 5 `g° py w ,. ,. <br /> BCU-4 600 240 26.4 26D 20 1 a g z _ I IN C a Gi 3 52 n 5 3 KP o € iI - i-7 r a 1 J 3 6 , ig s <br /> BCU-5 BOO 200 22.0 2.20 20 1 <br /> `a' a i d $ a a o VP A: s d w a 5: 9 m x w o w C=1 0 a w w w w design phase: <br /> UV-2 0 250 5O 5.550 20 7 <br /> 33.0 5. <br /> UV-2 10000 250 SS0 20 I BEW�WIPMENT GAS FIRED BOILERS X K X 0 X X X X X X SACS ENABLES BOILERSPERMIT <br /> UV-3 1000 250 55.0 5.50 20 1 BURNER 0 D 0 0 INTERNAL CONTROL AND ALARM SET <br /> UV-4 1000 250 55.0 5.50 20 1 FAN 0 D 0 <br /> UV-5 1000 250 55.0 5.50 2D 1 BP-1,2 BOILER PUMPS X X 0 X 0 MODULATED BY BOILER <br /> UV-6 1000 250 55.0 5.50 20 1 SPEED CONTROLLER 0 X 0 .................................__..__-___..._............._. <br /> UV-7 1250 250 65.0 6.50 2D 1 P-1.2 MAIN CRC PUMPS X X X X revisions: <br /> UV-8 1250 250 65.0 6.50 20 1 WO-1,2 CIRC PIMP VFD X X X X X <br /> UH-1 200 N/A 5.0 050 20 3 no. description date <br /> SUPPLY WATER TEMPERATURE X <br /> UH-2 200 N/A 5.0 0.50 20 4 RETURN WATER TEMPERATURE X X X X <br /> SUPPLY WATER PRESSURE X X <br /> NW-2 1600 250 95,5 9.50 20 1 CO DETECTOR CO ALARM % X <br /> HVO-3 1500 250 90.0 9.00 20 1 MO EMERGENCY SHUTOFF % % <br /> HVU-4 1500 250 90.0 9.00 20 1 - <br /> EXHST.EQUIPMENT <br /> HVU-5 1800 250 107.5 10.75 20 1 <br /> HVU-6 15D0 250 MO ROB 2D 1 SNIP PUMP EKIST SUMP PUMP % % % % <br /> HVU-7 1500 250 80.0 ROD 20 1 RAD;UV,BCU;HVU TERLBNAL UNITS(IBEX CONTROL) K X (E) (E) (E) (E) (E) (E) (E) (E)(E) (E) (E) (E) (E) (E) (E)=EXISTING IBEX POINTS <br /> HWI-8 1500 250 80.0 ROD 20 1 NOTES <br /> 0 RENAL CONTROL POINT <br /> - HVU-9 2000 250 119.0 11.90 2D 2 X DOC POINT <br /> RAD-1 N/A N/A 14.5 1.50 20 5 <br /> RAD-2 N/A N/A 3.9 0.40 20 5 '� <br /> RAD-3 N/A N/A 6.6 0.70 20 5 }K , <br /> - RAD-4 N/A N/A 6.8 0.70 20 5 ,A,�Jy♦- <br /> RAD-5 N/A N/A 6.6 0.70 2D 5 P'A�' <br /> RAD-6 N/A N/A 14.4 1.40 20 5 <br /> RAD-7 N/A N/A 6.6 0.70 20 5 __ @ R �� <br /> • RAD-8 N/A N/A 7.0 0.70 20 5 YR°...°-'m' <br /> RAD-9 N/A N/A 6.6 0.70 20 5 ,AF�� R gqp�gp .�Wp FOR PERMIT <br /> q L.� design by: R L/A V <br /> RAD-TO N/A N/A 7.0 0.70 20 5 Ai\ �5 E�">ip E'-L a Bs� fl P I r drawn by: J A/J Z <br /> REMARKS: ®ate.66..// 6 �"" I[ <br /> scale: as noted <br /> 1.REPLACE EXISTING THREE WAY VALVE PATH NEW TWO-WAY VALVE <br /> 2.REPLACE EXISTING THREE WAY VALVE WITH NEW THREE-WAY VALVE <br /> date: 11 15/2022 <br /> 3.INSTALL NEW THREE WAY TWO POSSITON VALVE TO EXISTING WILD COIL <br /> 4.INSTALL NEW TWO WAY TWO POSSTON VALVE ON MSTNG QUID COIL <br /> 5.REPLACE EXISTRO TWO WAY VALVE WITH NEW TWO WAY VALVE. job no.: 2022.1 25 <br /> sheet title: <br /> MECHANICAL <br /> SCHEDULES <br /> 1 approvals: sheet number. <br /> M 0•3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.