Contract Title:Vehicle Upfit and Service Bodies
<br />Bid Number:2023-157
<br />Submittal Deadline:1/16/2024
<br />Procurement Professional:Jenny Chang
<br />Item Description Estimated Value Markup Extended Markup Extended
<br />1 Body lighting $25,000.00 5%$26,250.00
<br />2 Bed liners $25,000.00 5%$26,250.00
<br />3 Bed inserts $40,000.00 5%$42,000.00
<br />4 Cab guards $25,000.00 5%$26,250.00
<br />5 Canopies $80,000.00 5%$84,000.00
<br />6 Tonneau covers $15,000.00 5%$15,750.00
<br />7 Liftgates $30,000.00 5%$31,500.00
<br />8 Bed-mounted fuel tanks $15,000.00 25%$18,750.00
<br />9 Winches $10,000.00 25%$12,500.00
<br />10 Toolboxes $25,000.00 5%$26,250.00
<br />11 Cranes $150,000.00 20%$180,000.00
<br />12 Compartment heaters $10,000.00 25%$12,500.00
<br />13 Hydraulic generators $10,000.00 30%$13,000.00
<br />14 Miller EnPak self-contained
<br />generator/welder $60,000.00 20%$72,000.00
<br />15 Hose reels $20,000.00 25%$25,000.00
<br />16 Pass-through bumpers $20,000.00 20%$24,000.00
<br />17 Miscellaneous items not listed $200,000.00 5%$210,000.00
<br />Subtotal $488,250.00 Subtotal $357,750.00
<br />Item Description Unit of Measure Estimated Quantity Unit Price Extended Unit Price Extended
<br />1 Installation Labor, including incidental
<br />supplies such as paint HOUR 500 $195.00 $97,500.00 $145.00 $72,500.00
<br />2 Pick-Up FLAT FEE 8 $125.00 $1,000.00 $0.00 $0.00
<br />3 Standard Delivery FLAT FEE 8 $125.00 $1,000.00 $0.00 $0.00
<br />4 Expedite: Delivery within 60 days from
<br />receipt of vehicle FLAT FEE 2 $500.00 $1,000.00 $0.00 $0.00
<br /> Subtotal: $100,500.00 Subtotal: $72,500.00
<br />Part 1+2 Subtotal:$588,750.00 Part 1+2 Subtotal:$430,250.00
<br />Tax Rate 9.9%Tax Rate 9.9%
<br />Tax $58,286.25 Tax $42,594.75
<br />Total $647,036.25 Total $472,844.75
<br />Part 1 - Equipment
<br />Part 2 - Labor and Delivery
<br />Aalbu Brothers Fabrication
<br />Arlington, WA
<br />City of Everett
<br /> Bid Tabulation - Part A
<br />Al Van Equip NW Inc
<br />SeaTac, WA
|